Updates on the construction side of the project.

Plastering and windows

We’ve been working hard lately, trying to get the first two rooms and the cafe habitable before the end of the year. Long days and six-day weeks are taking their toll. And now I sit here trying to think of good ways to describe what we’ve done but I’m conscious that I have to get up at 7am and do it all again, and anyway my brain is crammed only with window frame dimensions and sand vs. lime ratios. So it’s really tempting to just let the photos speak for themselves…

Tiles went on

Tiles went on OK.

Tiling the roof in summer heat was a tough job. Koray had the worst of it; he was placing the tiles while the rest of us only carried them up onto the roof. The results are great though.

Summer visitors enjoying the pool.

Summer visitors enjoying the pool.

Some old friends from Spain came to see us (from left to right, that’s Mar, Julia, Diego, and Manuel). It was great to see them and to take a few days off to socialize. But I fear we’re not the best hosts at the moment.  We are always thinking about the project!

As you’ll see further down, plaster is going on the walls now and so the visible-straw-bale stage is almost entirely behind us. I will miss it though: for a while the interior looked like a warm and inviting barn.

The straw bale stage

The straw bale stage comes to a close.

Mesh attached to the walls, gaps stuffed with fabric.

Plaster preparation: mesh attached to the walls, electrical cables installed, gaps in the straw stuffed with fabric.

Preparing for old-school lathe and plaster in the cafe.

Taking the old-school lathe-and-plaster approach in the cafe.

Plastering was a learning experience, like everything else. The air-powered plaster sprayer we imported from the US worked well at first, but tended to get blocked within about 30 minutes of use. You had to pull it apart to clean it, so it wasn’t a time-efficient approach. In the end we did the first coat of plaster the traditional way: by flicking it on with a trowel.

Early stage plastering: first coat is flicked on with a trowel.

Early stage lime plastering: first coat is flicked on with a trowel. (Note the privacy barrier separating the verandahs for rooms one and two.)

Interior plastering: working up to the desired thickness.

Interior plastering: working up to the desired thickness.

Roughly speaking, the plaster is about three parts sand to one part hydrated lime. Although Berrin has been doing most of the mixing, and she’s not following an exact recipe but instead judges the plaster consistency by eye. The ear is helpful too: you get used to the sound a good mix makes as it sloshes around the mixer.

The second coat is about filling up gaps and bringing the surface out to approximately where you want it. The final coat is made with finer sand and more lime, and gives a beautifully smooth finish. As the final coat dries, there’s much more of a sense of what the completed building will look like.

Smooth final coat of plaster on the south side.

Smooth final coat of plaster on the south side.

Berrin mixing five barrow loads of plaster for Koray.

Berrin mixing five barrow loads of lime plaster for Koray.

Late-stage interior plastering: one more coat to come.

Late-stage interior plastering.

We got some professional carpenters in to give us quotes on doing all the doors and windows. Unfortunately some of the quoted numbers were a bit eye-watering, so we’ve decided to do it ourselves. It will take longer, but we’ll save a lot of money and we know we’ll get the look we want. Right now the workload is split, with Koray and Berrin on plastering while Sirem, her sister Çisem, and I do windows and doors.

Time to build some windows and frames.

Time to build some windows and frames (glass comes later).

My office.

Back in the office.

Çisem after a day of sanding windows and doors.

Çisem after a day of sanding windows and doors.

Window frames going in, with bags of lime in the foreground.

Windows going in, with bags of lime in the foreground.

Another view of the windows; you can see what the finished product will look like now.

Another view of the windows; you can see what the finished product will look like now.

Lathe and plaster success!

Lathe and plaster success!

So that’s where we are now. There are still a lot of jobs left to do: floor tiles, bathrooms, kitchen fitting, etc. But the end is in sight. We hope to be finished and open for our first guests early in 2017. (At which point we can start on the second building, of course.)

Zeliş gazing wistfully into the distance.

Zeliş gazing wistfully into the distance.

Weather still good but turning colder: the autumn sunsets begin.

Weather still good but turning colder: autumn sunsets begin.

 

 

A roof and some walls

So, we had a coup. An attempted one, anyway. Thank you to the many friends and family members who checked in to see whether we were OK at the time. It was a scary and confusing 24 hours of news coverage. But for us that’s all it was: a day of watching TV and browsing the web, trying to figure out what was going on. At times like that it’s nice to live in a small town far from significant buildings and infrastructure.

It was a sad day for Turkey, with around 250 people killed. And in the aftermath a lot of young soldiers are potentially facing long jail sentences, while many people have lost their jobs for alleged links to the shadowy Gülenist movement. All of this comes on top of the ongoing troubles in the southeast of the country, a terrorist attack at Istanbul airport, and so on. Interesting times indeed.

Of course we hope that the situation will improve. But there’s not a great deal we can do about it on a personal level, and the truth is it hasn’t affected day-to-day life around here at all. So we have just been pushing on with construction work as usual.

A big recent milestone for us was getting the roof completely covered with wooden planks. (The planks are there to support the waterproof membrane and the roof tiles, both still to come.)  As you can see in some of the photos below, the planks shrink a little after being nailed down, so there are some gaps that let light through. But it still feels much more like a building now that it has a covered roof.

Koray working on the roof.

Koray sawing planks on the roof.

Verandah coming together.

Verandah coming together.

Roof planks completed.

Roof planks completed.

The pool has been a lifesaver, making working through the hot days of summer much more bearable. Which I guess is a good sign of its future popularity. One of our little pleasures is a drink by the pool in the evenings. The water is so warm that you don’t really want to get out.

Evening drinks by the pool.

Evening drinks by the pool.

The roof at night; lights of Germencik in the background.

The new roof at night; lights of Germencik in the background.

And now a photo of me looking grumpy in the heat.  (Sirem insisted that I include it.) It looks like I should probably go for a swim and cheer up.

Portrait in 40 degree heat.

Portrait at 40 degrees C.

In parallel with the roof work, we’ve been building up the straw bale walls. It’s a mixed bag of a job: sometimes it’s easy and fast, like when you have a long run where you can use whole bales. But then you get to a fiddly bit in the corner or between two windows, and there’s a lot of splitting and re-tying the bales, which can get tedious. And especially when you have to lift bales up above your head for the higher sections, you end up wearing and breathing a lot of straw which is not the nicest feeling in the world. On the plus side, you do get to play with the chainsaw, which is essential for carving the bales so they fit neatly around the building’s wooden frame.

Straw bale interior.

Straw bale interior.

Essential equipment for shaping bales.

Essential equipment for shaping bales.

Roof from inside, with ceiling test panel.

Roof from inside. The white part is a test for one of our ceiling ideas: going to need something to hide all the insulation between the rafters.

There was one final part of the structure that we’d been putting off for a while: an overhanging verandah for the cafe area at the west end of the building. It’s mostly done now. There were a few steps involved: concrete bases for big 15cm x 15cm columns, getting the support beam up on top of the columns, then getting the 5-metre rafters up. That’s where we are in the “after” photo below. And still to come are planks, guttering, waterproofing, and tiles, just like the rest of the roof.

Front of the cafe area.

Before photo: the front of the cafe area.

And now with added verandah rafters.

After photo: the verandah will add shade for plenty of outside tables.

It’s no surprise that summer has brought more visitors than winter did. Some weeks back we hosted Elisabeth and Max, some friends from Germany via Southampton. They got very involved in the construction work and we’re grateful for their help. Elisabeth and Max (and some co-conspirators; looking at you, Alex) also have a fine tradition of candid photography that truly captures the modern, relaxed German style. So who were we to refuse them?

German efficiency.

German efficiency.

The next batch of visitors were my mum and dad, Diane and Barry. They were last here exactly a year ago, when nothing had happened yet up in the orchard. (And previously they were our very first visitors, a year before that.)  So, once more, it was great to see our recent progress through their eyes. Dad especially got involved in the building work, and mum played an important pool-testing role. We really appreciate their help.

Mum and Dad visiting.

Mum and Dad visiting, checking out their soon-to-be-favourite area of the cafe.

Animal lovers, you thought I had forgotten you, didn’t you? Not a chance. Apologies that it always seems to be the same animals in these photos: it happens because some of them have pre-emptively adopted the building site as their new home, while others live down in the old farmhouse and thus keep away from the cameras.

Cat.

Sookie being sweet, in between psychotic episodes.

Dog.

Tito feeling a bit tired and sorry for himself on a hot day.

We were originally expecting our roof tiles several weeks ago, but there were delays from the supplier’s end. Apparently they needed to make a special batch just for us, because generally they don’t sell a lot of roof tiles in the middle of the summer. Apparently no-one but us is foolish enough to do roofing work in the heat. We are currently finding out just how sensible this accepted wisdom is: photos of the tiled roof to follow next time, I hope.

Roof tiles arrived at last.

Roof tiles arrived at last.

Roof with temporary plastic in case of rain (unlikely).

Roof ready for tiling. That’s a temporary plastic cover in case of rain.

Finally, we want to dedicate this post to our great friend Jesús Palomo Muñoz (1967-2016). He was a fantastic person who has left us all much too soon. We will miss him.

Roof started, bales arriving

There will be no food photos, look-at-this-sunset photos, or archaeology photos in this post. (Apologies if any of those are your thing.) Around here lately it’s all construction, all the time.

There will of course be some cat and dog photos. I am not a monster.

Main beam going up

One section of the main beam in place

Previously we showed you the central spine of the building: a series of beams, sitting up on columns, that help to hold up the roof. These beams and posts were only half the story though. Another series of even bigger beams has to go up on top of the first one in order to form the ridge of the roof.  The longest section is about 5.5 metres long, and getting all that wood up there was probably the toughest and scariest job we’ve done so far.

Rainbows on a cloudy day

Main beam complete, plus a rare summer storm with rainbows

In the second photo you can see how the ridge beam looked once it was secured in place. You can also see that we get the occasional dramatic summer storm.

And from another angle it’s clear how close the building is to the pool. We’re hoping that will turn out to be a good thing as the roof itself, with its wide eaves, will provide some much-needed shade on the pool terrace in the late afternoons.

Ready for rafters

Sirem and Koray taking a break by the pool; ridge beam in the background

With the ridge beam up we were ready to start work on the roof, which meant a final big timber delivery. Here’s a stack of six-metre planks ready to be used as rafters.

Rafters delivered

Rafters delivered

The rafters need diagonal cuts on each end to get them to the right length, plus a “bird’s mouth” cut to make sure they sit nicely on the top rail of the wall framing. We’ve also been sanding the bits that are going to remain visible once the insulation and the ceiling panels go in — it would be a shame to hide all that nice wood behind a plain white ceiling.

First rafters up

Evening shot of the first few rafters installed

Coming together

The roof structure starting to take shape

Cezmi approves

Of course Cezmi went up on the roof to inspect it

The roof isn’t finished yet, but it’s already made a big difference to the site.  Even a partial roof provides a lot of shade and the rising summer temperatures are easier to bear now we can get out of the sun.  The cats and dogs have noticed this too and are hanging around even more than usual.

Zeytin is always helpful

Zeytin is always helpful

Cezmi continues his supervisory role

Cezmi takes a break from his supervisory role

Tea break

Tea breaks are much more pleasant in the shade

It’s harvest time for wheat farmers in the area, so we’ve been buying straw bales while they’re cheap.  So far we’re paying 9 lira, or about £2.15 per bale, delivered. (Apparently if you leave it too late in the year, the price goes up quite a lot.)  The first batch was 80 bales that came up on the back of a tractor trailer, but we’re going to need about 500 in total for the building.  And another 500 later for buildings two and three, but that’s a future problem.

Straw bales arriving

Straw bales arriving

For now we’re storing the bales in what will one day be the cafe kitchen.  You can see some ceiling joists in the top of the shot, as the kitchen will have a little storage loft above it.

Straw bales stored in the kitchen

Straw bales stored in the kitchen

Here’s a view from inside the cafe area, looking over at the doorway to the kitchen. Those two interior window structures on the right will eventually become the bar (a very important feature).

The bar

Looking across at the bales via the kitchen door and the bar

Sookie, mother of kittens, has taken to disappearing on mysterious multi-day journeys now that the weather is warm. She decided that sleeping on straw bales was a good enough reason to come home though. It’s always a relief to see her back safely.

Sookie returns

Sookie returns

We decided on old-school wooden planks over OSB or plywood for the roof.  One reason is that real wood will hold up better if there is ever a leak. Another is that sections like the verandah roof and under the eaves (where there won’t be any insulation or ceiling panels) will look a lot nicer in real wood. And the cost worked out about the same as OSB anyway.

Roof planks going on

Roof planks going on

View from the pool

Another view from the pool area

After all the rafters and planks are up, the next steps are gutters, waterproof membrane, and ceramic tiles, in that order. Then we can get to the fun part of stacking those straw bale walls.

Framing and planting

Apparently some readers worry that there won’t be any animal photos in a new blog entry. So this time I thought I would end the suspense and get the animal photo out of the way early. (Only one this week, sorry.) Here is Cezmi — our construction site manager in cat form — sampling the water of the swimming pool.

Cezmi by the pool

Cezmi by the pool

So we’re working pretty hard at the moment, doing long days six days a week. Rain is our only interruption, and it’s getting to the time of year when rain is a rare event. A couple of Sundays ago we gave ourselves the day off and went for a drive in the mountains. Here are Sirem’s parents posing at the side of the road. This spot is about twenty minutes up into the hills behind our house.

Sirem's mum and dad, Nadire and Dogan

Sirem’s mum and dad, Nadire and Doğan. We wouldn’t be making so much progress if they weren’t doing a lot of the cooking and shopping for us — thanks!

We had lunch in the beautiful village of Birgi, right next door to the ski resort at Ödemiş, about 80km northeast. And did a tour of the local garden centres, but more on that later.

View of Birgi

View of Birgi

Traditional Turkish architecture in Birgi

Traditional architecture in Birgi

The building work is progressing well. We’re roughly on schedule, but can’t afford to relax as there’s still a lot to do if we want to be ready for our first guests by the end of summer.

The first phase of the work was getting the bathroom walls up. (They’re made of brick so we don’t have to worry about water from the showers ever penetrating the straw bale walls.) We’ve learned to lay bricks pretty well, I think, although we are nowhere near as fast as Koray.

Bathroom brickwork

Bathroom brickwork and improvised sunshade

The next step was taking the 10cm x 10cm lengths of treated timber and bolting them down to the concrete slab to act as a secure base plate for the timber framing. This went a lot easier than I thought it would. Luckily we have a beast of a drill that makes holes in the concrete without any fuss at all. We then used a two-part epoxy to glue 14mm threaded rod into the holes. Incredible stuff and it’s all rock-solid now.

Putting down the treated timber base plates

Putting down the treated timber base plates: you can start to see the floor plan

After that it was time for the timber framing to begin in earnest. Of course it’s not something we’ve done before, but after watching some videos on YouTube how hard can it be?  :)

ARE YOU NOT ACCOMMODATED?

ARE YOU NOT ACCOMMODATED?

The walls have gone up fast, although there are still details to take care of, like completing the internal stud walls and finishing all the window sill and lintel boxes. We’ve currently moved on to the spine of the building and put up some columns and beams that will help hold up the roof. Lots of this timber will be exposed in the finished build, so we took a bit more time with it and sanded each piece before it went up.

...

View of the exposed column-and-beam arrangement in room 1, looking through to the kitchen and cafe beyond. Please disregard the blocks of scrap timber temporarily holding it together.

...

The spine of the building, looking the other way towards the pool. Note that the ridge of the roof will be about 1.6 metres higher again.

...

Detail of a wooden column with T-bar support for the beams

...

Our favourite local mountain shot through the framing

There has also been some progress on the landscaping front. The gardens still look a bit dry and sparse but hopefully as everything matures they will become beautiful.

...

The fruits of a trip to the garden centre

...

Trying to make the most of the slope by building lots of small gardens on different levels

...

Kumquat and some kind of grass thing

...

Bougainvillea that will one day be encouraged to wrap itself around a verandah post

...

Lily in the sun

The pool railings are finished and installed: welding by Koray, painting by Sirem. We like how the ferforje (curly bits) turned out. Ornate, but not too fiddly.

...

New railings in place

...

Terracotta pots seem to suit the pool area

Most of our photos are taken from the south side of the building site, perhaps because that’s where the driveway puts you as you come up the hill. Here are a couple of shots from the north side that give a different perspective. The first one is a panorama showing the current condition of the pool area. The seating on the left is going to be great once we render the brickwork and build a pavilion roof: it’s possibly a bit too sunny at the moment.

Pano

Pool panorama

This one is taken from across the road on the opposite hill. You can see the whole project from here. From left to right: slab for our house, slab for rooms 3 and 4, the pool area (behind the poplar), timber frame under construction, and the driveway.

...

Project overview shot

And finally, I know I take too many photos of this mountain, but forgive me.  It’s hard to resist, and I don’t get out much.

...

Mount Mycale and Mount Thorax in changeable morning light

 

Deliveries

Let me warn you up front: this blog post, and probably future posts for a while, are going to be variations on the theme of “look at this thing we made!”

With that said… I am learning, too late in life, that a huge part of construction is just moving stuff around.  Here are three of our most recent deliveries, more or less neatly stacked.

Bricks

Bricks

Steel

Steel

Timber

Timber

That last one is not just a gratuitous night-time shot: the timber really did arrive late in the evening.  In fact it was delayed for a week or so longer than we were expecting.  The 10cm x 10cm pieces on the right are chemically treated to resist moisture, and those took a while to get hold of.

It wasn’t really a problem though.  We have so much to do if we’re going to hit our target of real guests by late summer, so we just worked on some landscaping instead of timber framing.  This next shot is yet another Sketchup model showing our plans for around the pool.  A steel railing to stop people falling off the terrace after one Tuborg too many, and on the other side a little pavilion surrounded by gardens and incorporating two built-in seating areas.  In summer we’ll hang some canvas or cotton at the front of the seating area to keep people in the shade during the hot afternoons.

Some of the planned landscaping around the pool.

Some of the planned landscaping around the pool.  The shadows are as they would be on the summer solstice at around 4pm.

Sharp-eyed readers will note that we haven’t really decided what’s happening at the back of the pool: probably a wooden fence with a lattice to grow climbing plants on.  It would be nice to have a rendered and limewashed brick wall but we’re thinking it’s a bit too close to the edge of the hillside for a heavy wall to be 100% safe.  Anyway, here’s the progress we’ve made in the last week on the seating area.

Poolside seating pavilion, under construction

Poolside seating pavilion, under construction

Koray, the guy you saw welding a door in the previous post, is now working with us full-time.  We really needed some more people power if we’re serious about opening the first two rooms this summer.   One of the first things he did for us was to install that door.

The door Koray was welding in the last post, now safely installed.

The machine room door, now safely installed.  (I did the twirly bits, honest.)

Koray has also done great work on building a stone retaining wall up the left side of the driveway, as well as a dozen other things.

Stone retaining wall on driveway nearly finished

Stone retaining wall on driveway nearly finished

Which reminds me, a big thank-you to my cousin Stephanie and her partner Mick.  They visited a couple of weeks back and helped carry a lot of the stones into position.  (We are officially becoming terrible hosts: “Had enough breakfast?  All done?  OK, great, now carry this 40 kilo rock.”)

At the foot of the stone wall there’s a concrete gutter.  Previously this ran into a large hole that connected to the storm-water drain.  Health and safety concerns suggest we shouldn’t leave a large hole lying around long-term, so I got to improve my bricklaying and rendering skills by building a drain cover.   We tried using powdered dyes to colour the rendering coat: two scoops of red, four scoops of yellow, and one scoop of black.  Not too bad a result if you like the Santa Fe adobe look.

Here's one I made earlier: drain cover

Here’s one I made earlier: drain cover.  Note modernist grille made by welding scrap rebar pieces together.

Here are a couple of photos of things we’re making with all those deliveries.  The bricks are for parts of the guest bathroom walls.  We’re still committed to straw bale, but we lost our nerve at the thought of the waterproofing needed to be sure that a straw bale in the wall behind a shower would never get wet.  So the external walls of the bathroom, and the wall between the two bathrooms, will be brick.  Still, they’re big 30 x 20 cm bricks with some air holes in them, there’ll be a double wall, and the 10cm gap between the inner and outer wall will be filled with polystyrene insulation.  It won’t quite be as good as straw, but should still be reasonably well insulated.

The first two guest bathrooms laid out with bricks

The first two guest bathrooms laid out with bricks.   Each bathroom is about 3 metres by 2 metres: big enough for everyone?

The steel is for pool terrace railings as shown in the Sketchup picture above.  They’re nearly done; they just need some twisty decorative bits (“ferforje” in Turkish) and a coat of black paint and they’re ready to go in.

Pool terrace railings under construction

Pool terrace railings under construction

And all this welding seems to be catching:  Sirem has now joined the party.  It looks like she’s been doing it for years, doesn’t it?

Sirem getting in on the welding action.

Sirem getting in on the welding action.  (Thanks to Stephanie for the photo.)

We’re still some distance away from the straw bale and plastering stage, but we’ve done some more testing recently to decide between clay plaster (which has the benefit of basically being free) and lime plaster, which stands up to moisture a lot better.  I think we’ve decided on the lime plaster solution, but it’s a shame to have to say no to the clay as the texture is really nice.

Plaster testing: three coats of mud plaster

Plaster testing: three coats of clay plaster on a straw bale (second coat still showing at the top there)

Plaster testing: two coats of lime plaster on a straw bale

Plaster testing: two coats of lime plaster on a straw bale

The pool has been properly filled and we are pleased to report that it didn’t fall over or spring a leak.  There was even a warm day in late February when I was stupid enough to try a first swim.  The pool was very nice but the water needs a bit more sun on it, I think.

What the pool looks like now

What the pool looks like now

And finally, a few shots of plants and animals to show that it is not quite all-construction, all-the-time.

Spring returns: almond blossoms in the neighbour's garden

Spring returns: almond blossoms in the neighbour’s garden

Zeliş relaxing

Zeliş relaxing

Zeytin is in a good mood, as usual.

Zeytin is in a good mood, as usual.

Cezmi, Sirem's sister's cat, maybe now our  cat, who believes he is the construction site manager

Cezmi, Sirem’s sister’s cat, maybe now our cat, who believes he is the construction site manager

Thanks for reading!

Cats, dogs, welding, and other delights

Greetings and salutations.

So, construction continues, but slowed down a bit by the winter rains.  And we’ve had some cold, grey days just recently, so here are a couple of photos from late last summer to warm things up.

Dilek national park, just opposite the Greek island of Samos.

Dilek national park, just opposite the Greek island of Samos.

Lifeguard's tower at the beach.

Lifeguard’s tower at the beach.

The foundations are done, and the pool is done except for being cleaned out and filled up.  It’s really the final few things now before timber framing starts in earnest (yes, I know I said that last time).  We’re just sorting out some drainage issues (e.g., where should all the rainwater go when there’s a big downpour?) and getting power and phone connections up to the slabs.

Sirem talks to the builder.  That blank wall is the edge of the pool's sun terrace, and the dark doorway on the left is how you get to the filter room.

Sirem talks to the builder. That blank wall supports a big terrace area next to the pool, and the dark doorway on the left is the way into the machine room where the pool filter and pump live.

Pool from above, showing the surrounding terrace.

Pool on a much greyer day, showing the surrounding terrace and the view.  Right now it’s an infinity pool, but we will partly spoil that by putting a building in the way.

The dogs check out the new tiles.

The dogs check out the new tiles.

Pool is done but needs a good clean.

Pool is done but needs a good clean.

Services all going into one big trench.

Services all going into one big trench.

Another in-progress job is sorting out a retaining wall for the bank of earth on the left side of the driveway.

Concrete laid on the side of the driveway, forming fa base for the stone retaining wall and a storm-water drain channel.

Concrete laid on the side of the driveway, forming both a base for a stone retaining wall and a storm-water drain channel.

34 tons of rocks to make a wall.

34 tons of rocks to make a wall.  We have to do it now, too, or we can’t get up the driveway.

What else?  We’ve had a re-think about the order in which to build everything: the new plan is to start at the bottom of the hill and work up.  So the first building will be the biggest one: the cafeteria and kitchen along with rooms one and two.  We figure this will make it possible to open for business before all three buildings are finished.  We can do the landscaping as we work our way up the hill, and use some kind of screen to hide the active construction from our first guests.   With luck, we could have people staying for real by late summer.

With that in mind, this is the view you would get if you walked out onto the verandah of room one.

View looking out over the neighbouring olive groves.

View looking out over the neighbouring olive groves.

Our little menagerie keeps us as busy as ever.

Front to back: Coco, Panini, and Pablo.

Front to back: Coco, Panini, and Pablo.

We had a big scare recently when Pablo, the black-and-white kitten, tried to poison himself by eating an especially dodgy mouse, but thankfully he pulled through.  Lost a bit of weight though.  This is him milking his illness for all it was worth.

Pablo convalescing.

Pablo convalescing.

And in our animals’ defence, they do try to be helpful when we’re working on the site.  Zeliş and Zeytin in particular are very sociable and like to park themselves in a comfortable patch of dirt and watch people work.

Zeliş notices something alarming.

Zeliş notices something alarming.

 

I’ve been pushing my welding skills a bit further.  The power to join two arbitrary bits of steel together has opened up lots of possibilities for future interior and exterior decor.  Here’s a simple little practice project I did last week…

Over-sized coat hook set (welded steel attached to wooden board).

Over-sized coat hook set (welded steel attached to wooden board).

I also started work on a metal security door for the pool’s machine room, but our plumber, Koray, took pity on my amateur skill level and offered to help out.  I say “offered to help out” but really it was more along the lines of “what are you doing?! you’re ruining it!  give me that!”  Great guy though, and helping him build the door has been very educational.

Koray in action.

Koray in action, welding a steel door and frame.

The barn has been cleaned up a bit and features a new home-made workbench.  The size and weight of the thing are probably overkill but I needed something heavy and solid to attach a vice to.

The barn looking as neat as it's ever likely to.

The barn looking as neat as it’s ever likely to.

Seeing as I am about to become a very busy carpenter, I also put together a handy little drill storage board, as suggested by a friend (thanks, John).  Getting a photo of it proved to be a bit trickier than expected though.

Panini, do you mind?  I was trying to take a picture of that thing behind you.

Panini, do you mind? I was trying to take a picture of that thing behind you.

Panini, please!

Panini, please!

You guys...

You guys…

Finally: drills.  It's not rocket science, but it's very convenient.

Finally: drill bit storage. It’s not rocket science, but it’s very convenient.

And last but not least, something we don’t do very often: a photo of the two of us.

I should really get a haircut...

I should really get a haircut…

Construction update

And now a quick set of long-overdue photos of the ongoing construction work.  I know I should have posted something weeks ago, but every time I was about to put some pictures up, I was tempted to wait for just one more development!

Our builders have done a great job.  They’re nearly finished, and soon it will be up to us to get some timber frames happening.

The concrete foundation slabs went down in four stages: first a rough layer of concrete directly onto the ground.  That makes a base for reinforced concrete beams that will go under the load-bearing walls .

Formwork for the concrete beams that will end up under the heavily loaded parts of the slab.

Formwork for the beams that will end up under the heavily loaded parts of the slab.

Lots of steel reinforcement going in.

Lots of steel reinforcement going in.

The slabs were big enough that it wasn’t possible just to dump concrete directly from the truck, so the pumping truck was called in as well for most of the pours.

Fortunately, concrete trucks get up our new driveway without too much trouble.

Luckily, concrete trucks can get up our new driveway without too much trouble.

Pump for pouring the concrete into the formwork.

Giant pumping truck for getting the concrete into the formwork.

The third stage was to dump heavy railway gravel into the gaps between the concrete support beams: this sets up a good base for the finished slab .  The gravel truck deliveries were dramatic, and the driver did well to get the truck into every corner where stone was needed.

About 30 tons of gravel arriving.

About 30 tons of railway-grade gravel arriving.

Gravel used as fill for under the slabs.

Gravel used as fill for under the slabs, and plumbing laid in.  Ready for the final pour.

Meanwhile our animal comrades have become very interested in the building process.

Zeytin approves of the work.

Zeytin approves of the work.

A range of different animals have been up to check things out.

Inspectors both large and small have been up to check things out during the night.

Sirem in particular has been really busy acting as site foreman, but we’ve also made time for a few other jobs.  Some neighbours invited us to harvest their pomegranate tree (long story).  It took longer than we thought — lots of standing up a ladder and getting scratched.  But the pomegranates are fantastic and make a disturbingly healthy-looking juice.

Pomegranates stored for winter.

Pomegranates stored for winter: if you hang them up with string so they’re not touching each other, they last much longer.

Ridiculously good for you.

Look at that vitamin C.  You could reach out and touch it.

We also put the finishing touches on our hügelkultur raised bed, which should make for lots of good vegetable options next spring.

Raised bed in the farmhouse garden is finally done.

Raised bed finally done.

And with colder nights coming in, I thought I had better build one more dog house for Tito (the dog who is not really our dog but just a stray who lives outside our gate and gets fed by us a lot).

Tito (who is not really our dog, he just lives on the street outside our place) get his own house.

Tito (who is not really our dog) gets his own house.  He is moving his head to make his face blurry which is part of his anti-paparazzi strategy.

The final part of the concrete work was pouring the 15cm-thick top slabs that will become the floor of each building.  The plumbing all seems to be in the right place so far.

Slabs all complete now.

Slabs all complete now (view from the top of the block).

And the swimming pool.  We know that in summer, life will centre around the pool for our guests, so we’re keen to do it right.  And the builders have been  fantastic.  (We’re happy to recommend them, if any Turkish readers are thinking about getting a pool built.)

Pool looking good.

Pool concrete looking good and being waterproofed.

Rounded steps in the south-east corner.

Rounded steps under construction in the south-east corner.

Tiles going in, and part of the deck area taking shape.

Tiles going in, and part of the pool terrace area taking shape.

Finally a couple of sunset photos so you can see what the winter light is looking like now.

Sunset with boots.

Sunset with work boots.

Winter sunset view from what will one day be the cafe terrace.

Winter sunset view (from what will one day be the cafe terrace).

 

 

Ground-breaking news

Since the last post a lot has happened. So many months of planning, waiting and worrying have finally started to bear fruit. Such a relief!

For some reason the council insists on the entire plan being printed on one long sheet.  This leads to much slapstick comedy when the wind is blowing.

The first job was heartbreaking but necessary: we had to cut down some fig trees.  :(  We lost about fifteen of them and had to relocate three olive trees.  Olive trees, we were told, are very tough and will tolerate relocation as long as you prune them hard and give them lots of water afterwards.  Time will tell whether this advice is correct.

Looking up the block at some of the lost fig trees that had to go in order to make way for the foundation slabs.

The second job was improving the driveway.  With last winter’s rains we had some erosion and it had become more like a goat track than a road.

Our driveway: the “before” photo.

We needed to do something if we were going to get heavy machinery, cement mixers, and delivery trucks up there.

Starting to dig

Excavator starting on the driveway.  Jason really wanted a turn but was not seen as responsible enough.

Gravel to make a nice compacted base

One of twelve truckloads of gravel to make a nice compacted base for the drive.

The “after” photo: from goat-track to motorway.  We like it a lot and it’s so wide that it immediately solves some of our future parking problems.

A view from the top, showing how the drive curves around to allow access to the cafe.  This was about halfway through.  More truckloads of gravel were dumped on the right side of this picture.

Then the excavator moved up the hill to start digging out the soil for the three buildings’ foundations and the pool.

Digging out the base for the cafe and first two rooms.

We had mountains of soil that we didn’t know what to do with.  At first it just got pushed over the edge of our hillside, but there was so much of it we were in danger of causing an avalanche onto the road.  So we had about 20 lorry loads worth of soil taken away, and lots of neighbours turned up with tractors and helped themselves to a bit.  We did keep some, though, for the mud plaster.

“And you could have it all, my empire of dirt…”

Battling machines

Rise of the machines.

The guys worked incredibly fast and before we knew it they were putting formwork, steel reinforcement, and the first loads of concrete in.

Early layer of concrete.  This not the real slab, just a bottom layer to make a good surface for the concrete formwork.

Early layer of concrete. This not the real foundation slab, just a bottom layer to make a good surface for the concrete formwork.

Pool starting to take shape.

Pool starting to take shape.

Formwork for the second bungalow.  One day this will be rooms three and four.

Formwork for the second bungalow. One day this will be rooms three and four.

Underlay slab for our house, right at the top of the hill.

Underlay slab for our house, right at the top of the hill.

Solid reinforced concrete beams that will support the restaurant.  The step up in the slab is so that rooms one and two will sit a little higher and not cut too deeply into the hillside.

Reinforced concrete beams that will support the restaurant. The step up in the slab is so that rooms one and two will sit a little higher and not cut too deeply into the hillside.

Improvised tent so there's somewhere dry to store gear and make tea on rainy days.

Improvised tent so there’s somewhere dry to store gear and make tea on rainy days.  The workers were sceptical of Jason’s plan to build this out of scrap wood but so far it is holding up.

Panorama from the top of the orchard, looking west.  Click for full size.

Another big job that is now done was to lay 66 metres of concrete pipe in the ditch next to the main road and then cover it over.  The idea is to carry away the rain water that comes down the hill, and also to stop our new driveway from acting as a dam.  Each pipe section was 1.5 metres long and 80 cm in diameter.  I am so glad that this job is over now as it was the scariest and most dangerous of all the work done so far. Watching the excavator lift and swing a very heavy concrete pipe in the air, hanging from a chain,  44 times in succession while traffic was still passing on the road was very nerve-racking!  I don’t think we remembered to take a photo of this job because we were so busy watching it nervously.

“Before” photo, taken in March 2014.

After: you can’t see it, but there’s 66 metres of 80 cm concrete pipe buried on the right-hand side of the road there.  Smoothing it over afterwards makes more handy parking spaces.

During these exciting times we had my parents and Jason’s uncle John and aunt Marg staying with us.   In the evenings one or two drinks were had in order to celebrate the start of the building work.

John and Marg inspecting the site.

Jason tells me I have to add cat photos to a blog post or people will complain.  So, here they are.  The kittens are getting bigger every day.  They have names now, but we are still trying to adopt them out.

Panda.

Panda.

Pablo.

Pablo.

Panini.

Panini.

Coco.

Coco.

All together.

All together.

And finally, a big thanks to JP who sent us a wonderful 24mm lens that took most of the photos above.  Cheers, JP, we love it!

Big day tomorrow

Tomorrow is a big milestone for us.  At 8am the excavator will arrive and ground will finally — finally! — be broken up in the orchard.  The first job is improving the driveway so that future cement trucks can make it up there without getting stuck.  And then it’s on to digging out the slab foundations and the swimming pool.  Exciting times.

So the next few blog posts will undoubtedly be full of construction stuff.  This post is the calm before the storm, if you like.  In the meantime I thought I should fill you in on what we’ve been doing as summer has turned into autumn.

We’re getting used to the seasonal cycle now.  As the hot weather starts to cool down, it’s time to dry and pickle and preserve things for winter.  Here’s a couple of photos showing how that works for tomatoes: boiled up with olive oil and salt and sealed into jars.  Great for making pasta sauce in January when there are no tomatoes in the shops.

Washing tomatoes

Washing and coring tomatoes

Storing tomatoes for the winter

Storing tomatoes for the winter

It also seemed like a good idea to get some last trips to the beach in, before the water gets too cold for swimming.  This shot was taken on the road to the national park, just coming up on Guzelçamlı with Mount Mycale in the background.

The road to the beach

The road to the beach

And this one is a few hours later, on the way home, looking back at the sunset.  Those hills on the right are actually the Greek island of Samos.

Dilek National Park at sunset

Dilek National Park at sunset

We’re still getting warm days with high temperatures between 25 and 30, but the summer drought has broken and the rain is starting to come a few millimetres at a time.  Here’s a sun shower we had one afternoon — the photo is looking out to the west, across our neighbour’s back garden.

Sun shower over next-door's house

Sun shower over next-door’s house

Our friend Carol came to stay for a week at the end of September, and this was of course an excuse to visit our favourite tourist spots again.  Şirince is always good for a lazy lunch and a walk around town.  I feel as though I have photographed the place to death on previous trips, so this time I tried to get a sense of the colours and textures in the souvenir shops and market stalls.

Jewellery and souvenirs

Jewellery and souvenirs

Lamps

Lamps

Olive oil

Olive oil

Silk scarves

Silk scarves

Carol flew out of Bodrum/Milas airport on a late-night flight, so we all drove down to Bodrum in the early evening to look around and have dinner beforehand.  I’m not sure that my pictures do it justice, but Bodrum (Halicarnassus in classical times) is lovely.  Development has been kept reasonable with a no-buildings-over-three-storeys rule.  Fantastic harbour.

Bodrum by night

Bodrum by night

Shop in Bodrum

Shop in Bodrum

Genuine fake watches

Genuine fake watches

Anyone who has been reading the news will not be surprised to hear that we saw quite a few Syrian refugees sleeping rough on the Bodrum waterfront.  Presumably they were looking for a boat to one of the Greek islands.  (No pictures as it seemed like the last thing they needed was a camera in their faces.)  A very sad situation that looks as though it may go on for a long time.

While we’ve been waiting for the work to start up in the orchard, it hasn’t all been swanning around the countryside and taking photos, honest.  We’ve also been doing the last of the jobs down here in the farmhouse.  With the help of our neighbour John, I learned to weld (read: “John decided that I was going to learn to weld whether I liked it or not.”)  Here’s my first welding project: a little stand to stop an old amphora from rolling across the courtyard.

First welding project

First welding project

We built another new door, this time for our bedroom.  (Note the inevitable cat flap.)

Another door

Another door, under construction

And we carried in a pallet and a half of bricks that will be used to build a raised bed and a retaining wall in the garden.

Bricks for raised bed and retaining wall

Bricks for raised bed and retaining wall

Thanks for reading.

More spring weather, more ruins, more plans

OK, this will be a quick one.  It’s a beautiful day and I’m supposed to be putting in irrigation pipes for the new trees, not sitting around at the computer.

Things are going well.  Spring continues to mean that plants are just erupting out of the ground: it’s amazing how quickly things grow here.  Here are a few shots of flowers and the garden to show what I mean.

lambs-4 lambs-5 lambs-6 lambs-7

The grape vines are definitely back.  We missed them!

The grape vines are definitely back. We missed them.

The season has also brought some new lambs to the farm of our friends at the other end of the village.  The lambs are very cute and Sirem could not resist having a cuddle.

lambs-1

Only 24 hours old.

lambs-2

Ready for her close-up now.

Sirem with her favourite.  The lamb also looks pleased.

Sirem with her favourite. The lamb also looks pleased.

And visitor season is also continuing.  Our recent guests Enrico and Bethany gave us an excuse to check out one more of the archaeological sites in the area.  We took them to see the ruins of Tralleis, up on a bluff above the provincial capital of Aydın.     It must have been a very imposing city in its heyday.  The biggest feature still standing is a distinctive triple arch that looks out over the valley.  All very Ozymandias.

The arch at Tralleis.  Some people for scale.

The arches at Tralleis. Some people for scale.

The arch from the other side.  Notice all the construction on the lower level: cellars or tunnels perhaps?

The arches from the other side. Notice all the construction on the lower level: cellars or tunnels perhaps?

Again we had the privilege of walking around a site like this without paying any admission fee, and seeing almost no other visitors.  I think those people in the first shot were our only company.  It’s not that Turks and tourists don’t care about these places; more that they are spoiled for choice about where to go.

Finally: we put in our revised plans for the hotel bungalows a couple of weeks ago, and we’re waiting to hear back from the council about whether the new version can be passed as just a minor revision of the old.   The differences weren’t huge, so we’re optimistic.

Probably the biggest change is that we’re now building a house for ourselves at the top of the orchard.  It’s quiet and peaceful there, and the view is fantastic, so  we can’t resist.  That means two fewer guest rooms up in the orchard, but in the long run we’ll make up the total of six by converting some rooms down here in the old farmhouse.

Another change is that we combined one of the guest bungalows with the cafe / kitchen, rather than having them as two separate buildings.  We think it makes the overall plan look less cluttered, and the thick straw bales mean the guests shouldn’t hear anything from the adjoining kitchen area.

An overview of the new plan.  You can see the existing farmhouse buildings on the far left.  Then, from left to right, it's the cafe plus two guest rooms, the pool, another two guest rooms, and then our new house at the end.

An overview of the new plan. You can see the existing farmhouse buildings on the far left. Then, from left to right, it’s the cafe plus two guest rooms, the pool, another two guest rooms, and then our new house at the end.

The cafe will have big french doors out onto the terrace area.  There's also a higher ceiling as the roof is common but the floor is lower. This seems to make the building blend into the slope a bit more.

The cafe will have big french doors out onto the terrace area. There’s also a higher ceiling as the roof is common but the floor is lower. This seems to make the building blend into the slope a bit more.

Plan view of the cafe, kitchen,and two guest rooms.

Plan view of the cafe, kitchen,and two guest rooms.

The double bungalow above the pool.

The double bungalow above the pool.

Interior of a typical guest room.

Interior of a typical guest room.

Interior view of our house.  Always wanted a mezzanine!

Interior view of our house. Always wanted a mezzanine!

 