Luxury accommodation in the Aegean countryside

Tag: hotel (Page 2 of 2)

Framing and planting

Apparently some readers worry that there won’t be any animal photos in a new blog entry. So this time I thought I would end the suspense and get the animal photo out of the way early. (Only one this week, sorry.) Here is Cezmi — our construction site manager in cat form — sampling the water of the swimming pool.

Cezmi by the pool

Cezmi by the pool

So we’re working pretty hard at the moment, doing long days six days a week. Rain is our only interruption, and it’s getting to the time of year when rain is a rare event. A couple of Sundays ago we gave ourselves the day off and went for a drive in the mountains. Here are Sirem’s parents posing at the side of the road. This spot is about twenty minutes up into the hills behind our house.

Sirem's mum and dad, Nadire and Dogan

Sirem’s mum and dad, Nadire and Doğan. We wouldn’t be making so much progress if they weren’t doing a lot of the cooking and shopping for us — thanks!

We had lunch in the beautiful village of Birgi, right next door to the ski resort at Ödemiş, about 80km northeast. And did a tour of the local garden centres, but more on that later.

View of Birgi

View of Birgi

Traditional Turkish architecture in Birgi

Traditional architecture in Birgi

The building work is progressing well. We’re roughly on schedule, but can’t afford to relax as there’s still a lot to do if we want to be ready for our first guests by the end of summer.

The first phase of the work was getting the bathroom walls up. (They’re made of brick so we don’t have to worry about water from the showers ever penetrating the straw bale walls.) We’ve learned to lay bricks pretty well, I think, although we are nowhere near as fast as Koray.

Bathroom brickwork

Bathroom brickwork and improvised sunshade

The next step was taking the 10cm x 10cm lengths of treated timber and bolting them down to the concrete slab to act as a secure base plate for the timber framing. This went a lot easier than I thought it would. Luckily we have a beast of a drill that makes holes in the concrete without any fuss at all. We then used a two-part epoxy to glue 14mm threaded rod into the holes. Incredible stuff and it’s all rock-solid now.

Putting down the treated timber base plates

Putting down the treated timber base plates: you can start to see the floor plan

After that it was time for the timber framing to begin in earnest. Of course it’s not something we’ve done before, but after watching some videos on YouTube how hard can it be?  :)

ARE YOU NOT ACCOMMODATED?

ARE YOU NOT ACCOMMODATED?

The walls have gone up fast, although there are still details to take care of, like completing the internal stud walls and finishing all the window sill and lintel boxes. We’ve currently moved on to the spine of the building and put up some columns and beams that will help hold up the roof. Lots of this timber will be exposed in the finished build, so we took a bit more time with it and sanded each piece before it went up.

...

View of the exposed column-and-beam arrangement in room 1, looking through to the kitchen and cafe beyond. Please disregard the blocks of scrap timber temporarily holding it together.

...

The spine of the building, looking the other way towards the pool. Note that the ridge of the roof will be about 1.6 metres higher again.

...

Detail of a wooden column with T-bar support for the beams

...

Our favourite local mountain shot through the framing

There has also been some progress on the landscaping front. The gardens still look a bit dry and sparse but hopefully as everything matures they will become beautiful.

...

The fruits of a trip to the garden centre

...

Trying to make the most of the slope by building lots of small gardens on different levels

...

Kumquat and some kind of grass thing

...

Bougainvillea that will one day be encouraged to wrap itself around a verandah post

...

Lily in the sun

The pool railings are finished and installed: welding by Koray, painting by Sirem. We like how the ferforje (curly bits) turned out. Ornate, but not too fiddly.

...

New railings in place

...

Terracotta pots seem to suit the pool area

Most of our photos are taken from the south side of the building site, perhaps because that’s where the driveway puts you as you come up the hill. Here are a couple of shots from the north side that give a different perspective. The first one is a panorama showing the current condition of the pool area. The seating on the left is going to be great once we render the brickwork and build a pavilion roof: it’s possibly a bit too sunny at the moment.

Pano

Pool panorama

This one is taken from across the road on the opposite hill. You can see the whole project from here. From left to right: slab for our house, slab for rooms 3 and 4, the pool area (behind the poplar), timber frame under construction, and the driveway.

...

Project overview shot

And finally, I know I take too many photos of this mountain, but forgive me.  It’s hard to resist, and I don’t get out much.

...

Mount Mycale and Mount Thorax in changeable morning light

 

Cats, dogs, welding, and other delights

Greetings and salutations.

So, construction continues, but slowed down a bit by the winter rains.  And we’ve had some cold, grey days just recently, so here are a couple of photos from late last summer to warm things up.

Dilek national park, just opposite the Greek island of Samos.

Dilek national park, just opposite the Greek island of Samos.

Lifeguard's tower at the beach.

Lifeguard’s tower at the beach.

The foundations are done, and the pool is done except for being cleaned out and filled up.  It’s really the final few things now before timber framing starts in earnest (yes, I know I said that last time).  We’re just sorting out some drainage issues (e.g., where should all the rainwater go when there’s a big downpour?) and getting power and phone connections up to the slabs.

Sirem talks to the builder.  That blank wall is the edge of the pool's sun terrace, and the dark doorway on the left is how you get to the filter room.

Sirem talks to the builder. That blank wall supports a big terrace area next to the pool, and the dark doorway on the left is the way into the machine room where the pool filter and pump live.

Pool from above, showing the surrounding terrace.

Pool on a much greyer day, showing the surrounding terrace and the view.  Right now it’s an infinity pool, but we will partly spoil that by putting a building in the way.

The dogs check out the new tiles.

The dogs check out the new tiles.

Pool is done but needs a good clean.

Pool is done but needs a good clean.

Services all going into one big trench.

Services all going into one big trench.

Another in-progress job is sorting out a retaining wall for the bank of earth on the left side of the driveway.

Concrete laid on the side of the driveway, forming fa base for the stone retaining wall and a storm-water drain channel.

Concrete laid on the side of the driveway, forming both a base for a stone retaining wall and a storm-water drain channel.

34 tons of rocks to make a wall.

34 tons of rocks to make a wall.  We have to do it now, too, or we can’t get up the driveway.

What else?  We’ve had a re-think about the order in which to build everything: the new plan is to start at the bottom of the hill and work up.  So the first building will be the biggest one: the cafeteria and kitchen along with rooms one and two.  We figure this will make it possible to open for business before all three buildings are finished.  We can do the landscaping as we work our way up the hill, and use some kind of screen to hide the active construction from our first guests.   With luck, we could have people staying for real by late summer.

With that in mind, this is the view you would get if you walked out onto the verandah of room one.

View looking out over the neighbouring olive groves.

View looking out over the neighbouring olive groves.

Our little menagerie keeps us as busy as ever.

Front to back: Coco, Panini, and Pablo.

Front to back: Coco, Panini, and Pablo.

We had a big scare recently when Pablo, the black-and-white kitten, tried to poison himself by eating an especially dodgy mouse, but thankfully he pulled through.  Lost a bit of weight though.  This is him milking his illness for all it was worth.

Pablo convalescing.

Pablo convalescing.

And in our animals’ defence, they do try to be helpful when we’re working on the site.  Zeliş and Zeytin in particular are very sociable and like to park themselves in a comfortable patch of dirt and watch people work.

Zeliş notices something alarming.

Zeliş notices something alarming.

 

I’ve been pushing my welding skills a bit further.  The power to join two arbitrary bits of steel together has opened up lots of possibilities for future interior and exterior decor.  Here’s a simple little practice project I did last week…

Over-sized coat hook set (welded steel attached to wooden board).

Over-sized coat hook set (welded steel attached to wooden board).

I also started work on a metal security door for the pool’s machine room, but our plumber, Koray, took pity on my amateur skill level and offered to help out.  I say “offered to help out” but really it was more along the lines of “what are you doing?! you’re ruining it!  give me that!”  Great guy though, and helping him build the door has been very educational.

Koray in action.

Koray in action, welding a steel door and frame.

The barn has been cleaned up a bit and features a new home-made workbench.  The size and weight of the thing are probably overkill but I needed something heavy and solid to attach a vice to.

The barn looking as neat as it's ever likely to.

The barn looking as neat as it’s ever likely to.

Seeing as I am about to become a very busy carpenter, I also put together a handy little drill storage board, as suggested by a friend (thanks, John).  Getting a photo of it proved to be a bit trickier than expected though.

Panini, do you mind?  I was trying to take a picture of that thing behind you.

Panini, do you mind? I was trying to take a picture of that thing behind you.

Panini, please!

Panini, please!

You guys...

You guys…

Finally: drills.  It's not rocket science, but it's very convenient.

Finally: drill bit storage. It’s not rocket science, but it’s very convenient.

And last but not least, something we don’t do very often: a photo of the two of us.

I should really get a haircut...

I should really get a haircut…

Construction update

And now a quick set of long-overdue photos of the ongoing construction work.  I know I should have posted something weeks ago, but every time I was about to put some pictures up, I was tempted to wait for just one more development!

Our builders have done a great job.  They’re nearly finished, and soon it will be up to us to get some timber frames happening.

The concrete foundation slabs went down in four stages: first a rough layer of concrete directly onto the ground.  That makes a base for reinforced concrete beams that will go under the load-bearing walls .

Formwork for the concrete beams that will end up under the heavily loaded parts of the slab.

Formwork for the beams that will end up under the heavily loaded parts of the slab.

Lots of steel reinforcement going in.

Lots of steel reinforcement going in.

The slabs were big enough that it wasn’t possible just to dump concrete directly from the truck, so the pumping truck was called in as well for most of the pours.

Fortunately, concrete trucks get up our new driveway without too much trouble.

Luckily, concrete trucks can get up our new driveway without too much trouble.

Pump for pouring the concrete into the formwork.

Giant pumping truck for getting the concrete into the formwork.

The third stage was to dump heavy railway gravel into the gaps between the concrete support beams: this sets up a good base for the finished slab .  The gravel truck deliveries were dramatic, and the driver did well to get the truck into every corner where stone was needed.

About 30 tons of gravel arriving.

About 30 tons of railway-grade gravel arriving.

Gravel used as fill for under the slabs.

Gravel used as fill for under the slabs, and plumbing laid in.  Ready for the final pour.

Meanwhile our animal comrades have become very interested in the building process.

Zeytin approves of the work.

Zeytin approves of the work.

A range of different animals have been up to check things out.

Inspectors both large and small have been up to check things out during the night.

Sirem in particular has been really busy acting as site foreman, but we’ve also made time for a few other jobs.  Some neighbours invited us to harvest their pomegranate tree (long story).  It took longer than we thought — lots of standing up a ladder and getting scratched.  But the pomegranates are fantastic and make a disturbingly healthy-looking juice.

Pomegranates stored for winter.

Pomegranates stored for winter: if you hang them up with string so they’re not touching each other, they last much longer.

Ridiculously good for you.

Look at that vitamin C.  You could reach out and touch it.

We also put the finishing touches on our hügelkultur raised bed, which should make for lots of good vegetable options next spring.

Raised bed in the farmhouse garden is finally done.

Raised bed finally done.

And with colder nights coming in, I thought I had better build one more dog house for Tito (the dog who is not really our dog but just a stray who lives outside our gate and gets fed by us a lot).

Tito (who is not really our dog, he just lives on the street outside our place) get his own house.

Tito (who is not really our dog) gets his own house.  He is moving his head to make his face blurry which is part of his anti-paparazzi strategy.

The final part of the concrete work was pouring the 15cm-thick top slabs that will become the floor of each building.  The plumbing all seems to be in the right place so far.

Slabs all complete now.

Slabs all complete now (view from the top of the block).

And the swimming pool.  We know that in summer, life will centre around the pool for our guests, so we’re keen to do it right.  And the builders have been  fantastic.  (We’re happy to recommend them, if any Turkish readers are thinking about getting a pool built.)

Pool looking good.

Pool concrete looking good and being waterproofed.

Rounded steps in the south-east corner.

Rounded steps under construction in the south-east corner.

Tiles going in, and part of the deck area taking shape.

Tiles going in, and part of the pool terrace area taking shape.

Finally a couple of sunset photos so you can see what the winter light is looking like now.

Sunset with boots.

Sunset with work boots.

Winter sunset view from what will one day be the cafe terrace.

Winter sunset view (from what will one day be the cafe terrace).

 

 

The plan

So what are we planning to build, exactly? Here’s a “before” picture showing what we’ve got to work with. Our fig orchard is that area with the trees up on the hill, and the courtyard with buildings on the left is the farmhouse where we’ll live while we work on the project. Towards the back of the picture you can see a cutting where the road goes up to a nearby lake and on into the mountains.

Plan showing the orchard and farmhouse as they are now.

Plan showing the farmhouse and orchard as they are now.

We want to build a six-room hotel, with the rooms grouped into three pairs. Each building will be a generously proportioned bungalow, and each room will have its own secluded verandah. We also need a swimming pool (of course!) and a kitchen with a terrace for serving breakfast, etc. Here’s our current plan for how it will all be laid out. That’s the kitchen and terrace at the bottom centre of the picture, and you can see a couple of pergolas giving shade for the garden. There’s also a low wall that runs along our southern boundary. Most of the verandahs will look out across the pool and to the south. Plenty of room on the roofs for solar panels, too.

Plan showing how the different buildings will be laid out on the orchard block

Plan showing how the different buildings will be laid out on the orchard block

These pictures were done in Sketchup 2013. It’s a great free-to-use 3D design program and we totally recommend it if you’re building anything from a bookshelf to a house.

Straw bale construction

We’re planning to build our guest accommodation using timber-frame straw-bale construction. We’re doing that for lots of different reasons. We think it looks great, e.g., in this straw-bale house interior from New Zealand.

straw-bale-home-New-Zealand

The 50cm+ thick walls will make excellent insulation during the hot summer months, and it’s a cost-effective green-building idea. It also fits in well with local Turkish architecture: many houses in the village are made from kerpiç (adobe bricks) and once we’ve covered our straw bales in clay plaster, the walls will look very similar.

One final reason: Turkey does get the occasional earthquake, and we’ve been really impressed with how well straw-bale houses hold up to earthquake testing.

Moving to Turkey

Photo of us Hi, and welcome to our blog. Some of you will already know us, and will have heard about our crazy project in great detail.  For those who haven’t met us before, we’re Jason and Sirem.  We’ve had enough of our jobs in the UK and are about to move to rural Turkey to build a hotel.

Semi-detached Southampton house This is the house in Southampton we’ll be leaving behind. We’ve been here for seven years and it’s been a great place to live, but it’s time to go.

And here are some photos of where we’re going.  We bought a small farmhouse and about an acre of fig orchard on a hillside near the village of Hıdırbeyli.  Which is near the town of Germencik, just inland from Turkey’s Aegean coast.

The orchard as it looked in March 2014.

Sunset from the orchard, looking towards Mount Mycale.

Looking out across the olive groves.

We’ll be about half an hour from ruins of Ephesus, with many other archaeological sites only a short drive away (e.g., Priene, Magnesia, Miletus, Didyma, and Aphrodisia). We’re also about half an hour from the beach.

All that archaeology gave us the idea for what to call the hotel.  We’re right in the middle of what was once Ionia, one of the colonies of ancient Greece.  So our place will be the Ionia Guest House.

The plan is to build a small hotel with about six rooms around a central garden courtyard and pool.  We want it to work as a base for visiting the attractions of the Aegean coast, and at the same time give people a taste of the Turkish countryside. We plan to grow our own fruit and vegetables, to use great local food, and to raise chickens for eggs.  We want to build the place in a sustainable way (timber-frame straw bale construction, covered in local clay plaster). It’s going to take us a couple of years to get it all up and running, so the blog is for keeping people up to date on our progress.

Thanks for stopping by.

Newer posts »

© 2024 Ionia Guest House

Theme by Anders NorénUp ↑