Hello, everyone.

Not a full post, just a quick announcement really. Much to our surprise, it looks like our episode of Our Dream Hotel has turned up on Australian television before it has made it to UK television. I know: very strange, but beyond our control.

So for any Australian friends who are interested: it’s on the Foxtel network, on the “Lifestyle and Documentaries” channel. We are season 1 episode 5 and I hear they’ve changed the title to Alex Polizzi’s Dream Hotel. It should be screening at 9:05am this coming Sunday, 8 October. (Not sure what time zone that is, presumably east coast.) Apologies for the Sunday morning time-slot: I don’t know whether Foxtel do on-demand streaming or anything like that so if anyone knows more about it please feel free to comment.

And for everyone else, a few progress photos.

If you squint you can see the new railings at the back of the pool area.

Railings on the terrace (still unpainted).

Recently Koray has been doing a ton of welding work as we put up a few more iron railings near the pool and on the cafe terrace. We’ve done this partly to help visually define the different areas of the site, but mainly it’s for safety.  Clearly we’d prefer to stop kids or drunk people ever taking a tumble down the steep hill that leads down to the road.

Kitchen looking more like a kitchen now.

Drawers!

The kitchen is looking much more like a place you could actually cook food in. Sirem and Çisem’s tiling work turned out wonderfully. The tiled worktops are very practical, we have a half-door to close off the kitchen from the cafe when we need to, and we also have actual working drawers. (Much better than keeping all the cutlery in a large basket.)

Only a few finishing touches needed now: grabbing the other fridge from the old farmhouse kitchen, installing a ventilator fan for the stove, building a big pantry cupboard, and building some stairs to the loft.

Sirem making planter boxes for the terrace.

As you can see the cafe is currently being used as a woodworking studio, but that’s all going to change soon. Later today we’re cleaning it out so we can set up all the new tables we’ve built. Looks like the remaining picnic tables are going to have to be built outside, but at least the weather is not so hot any more.

Garden still cheerful in October.

The slow transition from construction site to actual working hotel…

We’ve been quiet for too long; our apologies. These days we are busy with building stuff, as ever, but sometimes also with guests. Which is new and welcome territory for us. So first, a big thank-you to all the friends and family who have been bold enough to take a chance on us. We hope, obviously, that you all went home and told your friends what a fabulous time you had, and that we will see you again soon.

We’ve tried to keep everyone happy, and I hope we’re succeeding. For example, here’s our attempt at a breakfast for some vegan guests. Once you rule out eggs and cheese, we were worried we’d have nothing to feed them, but in fact Turkish food gives you a lot of options with salads, vegetables, pastries, and fruit.

The vegan breakfast option.

Sadly we have nothing new to tell you about when our episode of “Our Dream Hotel” is going to screen. Channel 5 moves in mysterious ways, it seems. I suppose it’s been a sobering reminder: we’ve probably put too much stock in the TV show as our one big “we’re here!” message to the outside world. There are many other things we can and should be doing to publicize ourselves (Google Maps, Trip Advisor, booking.com, etc.) so we need to be getting on with those. Channel 5 will show the episode eventually and it will be a nice bonus when it happens, but we’ve given up trying to predict when. Of course when it finally does air, we will be sure to let everyone know.

The big new structural addition is that we finally finished our pavilion by the pool. This was sorely needed as a way to provide some shade. The pool is great, but in the middle of a summer day the poolside terrace was very exposed. Now there’s somewhere cool and breezy to sit. And it’s so nice to see the end of those red bricks in favour of limewashed, rendered walls.

New pavilion by the pool. Building #2 will sit directly behind.

Cozy spot for summer evenings; lights of the village in the background.

There is a downside though. As it gets to late afternoon, the sun streams in from the west and the shade is lost. So we’ve tried to buy a few more hours with some white curtains on the front of the structure. We also like the look of them even when they’re open: they make it feel like a good spot for some decadent lounging around while being fed individual grapes.

Both sets of curtains in place.

The last remaining work to do on the main building is the cafe’s kitchen. On the left of this first shot you can see the bar, and beyond that there’ll be ladder-stairs to the loft, a big pantry, and a couple of fridges. On the right there’s a worktop extending pretty much the length of the room. We managed to get hold of a reasonably priced restaurant-style double sink that’s perfect for big pots and pans.

Kitchen worktops and cupboards under construction.

We did consider using a shop-bought worktop, laminated particle-board or whatever, but we couldn’t find one wide enough in a style we liked. (Our cupboards are a full 60cm deep and we like a bit of overlap at the front, and thus we needed something about 63cm wide.) So we’re doing the same thing we did in the old farmhouse kitchen and going with a tiled solution. It’s built up in layers: first 18mm plywood, then cement board, and finally tile adhesive and tiles. Nice advantage of this method is you can put hot things on it directly without any worries, but it does take a bit longer to install.

Sirem and Çisem putting up splashback tiles.

The terrace outside the cafe is nearly there. For now the surface is raked gravel: we were thinking of installing the same type of paving stones as on the driveway, but we thought it might feel like too big a paved area. So it’s gravel plus as many planter boxes as possible (still to come) to make it all feel a bit greener and more welcoming.

Terrace overview shot; disabled access ramp just visible on the far left.

We’ll have normal tables and chairs inside the cafe but the terrace will be picnic tables — to start with, at least. Think of it like a pub beer garden.  We’ve made a single prototype picnic table so far, just to get those critical seat-to-table distances right. Need to churn out a few more though.

First picnic table.

The cafe bathrooms are tucked around the side of the veranda so nobody ever has to sit at that terrible table near the loo. We’ve shown off the doors in previous posts; here they are mounted properly at last.

Cafe bathrooms ready for use.

And finally the main entrance to the cafe. We’ve had to prune that fig tree a little to keep it away from the roof, but we hope that in the years to come it fills out again and provides some nice shade over the steps.

Entrance to the cafe.

The gardens are doing well. For a long time we were watering them by hand, which took up a lot of time in the evenings. But now the drip-feed irrigation system is in and the plants are much happier.

Gardens looking healthy after a hot, dry summer.

Garden close-up #1

Garden close-up #2

Speaking of water, another bit of construction we did recently was getting two 10,000-litre water tanks in. They’re sitting right at the top corner of the block, in a spot that will one day be outside our bedroom window. One tank is mains water, equipped with a pump so we can keep good pressure in our system when multiple guests have showers at once. The other tank is grey water for irrigating the garden. Ultimately we’ll send water from the roof of our house into this second tank.

New water tanks.

And finally we can’t forget the animal photos now can we? Here’s a shot of Tito looking serious and dignified in his role as cafe watchdog.

Tito.

New kittens are the last thing we needed, but for better or for worse we have them. We found both of them on the street within a couple of days of each other so we think they might be sisters from the same litter. Lucy was hiding out in the local olive factory but crying a lot and took three days of convincing (i.e., milk and biscuits left at the gate) before she decided I was a trustworthy parental substitute. Lara on the other hand appeared at our kitchen window one night and took about three minutes to get herself adopted.

Lucy. Highly-strung but getting more relaxed every day.

Lara. Could you say no to this face?

I’m glad there are two of them because new kittens never seem to be very popular with the older cats (all generations of cats are the “me” generation) and this way they at least have each other to wrestle with.

Fight training begins.

TV show delay

This isn’t a proper update; it’s really just a quick word of apology to our readers in the UK to let them know that our episode of “Our Dream Hotel” won’t be going out on Tuesday 27th June after all. We’re really sorry about that.

The series is three episodes in at the moment, and we were due to be next week’s episode. However, Channel 5 have decided to juggle their schedule around a bit and it looks like they’re going to be inserting a new six-week series of “The Hotel Inspector with Alex Polizzi” at the Tuesday 9pm time-slot. We’re not quite sure of the reasoning but it’s their schedule to adjust of course. We think it’s likely that our episode will therefore be delayed by six weeks, which would move it to the 8th of August. However that date is just a guess on our part and we’ll certainly let you all know when we know more.

To anyone who was looking forward to watching it, apologies. But please don’t worry: we’re sure it will screen eventually. Apparently the ratings are quite good and the three hotels already featured had a rush of bookings after each of their episodes went out — music to our increasingly broke ears!

In the meantime we’re rushing to finish the cafe, the kitchen, and the terrace area. Here are some progress photos to tide you over, plus a couple of cat pics to stop certain people from complaining. And we hope to bring you more specific news about a date soon.

Small retaining walls define different areas on the terrace. (Really wanted to respect the existing slope rather than impose one big flat area.)

Cafe area is now tiled, so the doors can go up shortly.

Kitchen is ready for benches, ovens, fridges, etc.

Coco in his boudoir.

Pablo showing his excellent table manners.

Opening day coming soon

Right now I am supposed to be making either a garden trellis for the honeysuckle vines behind the pool, or a wooden worktop for room one’s kitchen area. Too busy to write much, but I thought I should post some photos to keep everyone up to date.

Our big news is that we have our first guests coming in early May so it’s really important that everything works and that the place is looking presentable. Room two (the one we show you all the photos of) is now 99% finished, while room one needs a bit of work but things are progressing fast.

Room in close-to-final form

Room two in close-to-final form.

Other view

Another view.

Mini-kitchen done

Room two kitchen area done.

Bathroom done

Bathroom now has a vanity mirror.

Towel hooks

More welding: towel hooks for the bathroom.

With actual guests coming, we need to make sure the place is accessible. On a rainy day you would struggle to get a typical rental car up the hill, so we knew that the time had come to concrete the driveway. The preparation work takes the longest: compacting gravel in the problematic low-lying sections, building borders and formwork to hold the concrete in, laying and wiring up lots of steel reinforcement, etc. Then two very tough days of actual concrete pouring and it was done. (I am currently trying to block out the memories.)

Sirem the day before the concrete went in

Sirem checking out the reinforcement the day before the first concrete went in.

Lots of work went into this shot

Lots of work went into this shot. (And yes, the hillside is a mess: one more thing on the to-do list.)

The really urgent priority is getting room one into shape, but we also have to do some landscaping work so the place doesn’t look so much like the building site it still is. That means more garden beds and lots of plants, but we also need a path to get to the rooms, the pool, and beyond. Concrete was a good solution for the steep driveway, but obviously we didn’t want to lay it everywhere. So the path is going to be built with paving stones.

Crushed gravel to support paving stones

Compacted river gravel to support the paving.

Paving stones

Paving stones going in, drainage canal taking shape.

Koray and Berrin

Koray and Berrin working on a garden wall. Those steel structures will become concrete posts to support the entrance gate, giving the accommodation area  a bit of privacy.

For two guest rooms and the cafe, we need a lot of furniture. Tables, beds, sofas, chairs, wardrobes, and all the rest. Given that we already have a lot of woodworking tools, and that the budget is running low, it was an easy decision to make most of the stuff ourselves. (The one exception: we’re buying chairs for the cafe. Chairs are fiddly and take too long.) There’s some work in it, but it’s great to be able to build pieces in the exact size and style you want.

Bed being made

One of the beds being made.

Table, sofa

Front to back: an angle grinder used as a brutally efficient sander, a very hardworking router, a table, and a sofa.

Finished bed

A finished bed with two little bedside tables: we definitely have a chunky country aesthetic going.

A new friend came to visit a few weeks back, and we used that as an excuse to do a practice run of the breakfasts we want to serve to our guests. Hopefully the photo below helps to convince someone out there to make a booking. Speaking of which: we’re going to start by listing the place on Airbnb, but we’re just holding off on one or two little details first, like our final inspection from the council. We’ll definitely make a post when that happens though.

Breakfast

Breakfast on the veranda.

Very soon we will have to get out of the way and move back down to the old farmhouse. We’re going to miss the new room, of course. But the weather is much warmer now and the leaves are back on the fig trees and the grape vines, so the old house is a much more cheerful prospect than it was in mid-winter.

Spring morning in the olive grove

Spring morning in the neighbours’ olive grove.

The dogs and cats are being their usual helpful, dirty, lazy, beautiful selves, and they’re clearly as happy as we are to see the return of warmer weather. Here are some dog photos to fulfill our prescribed animal content quota.

Tito yawning

Tito yawning.

Zeliş goofing around

Zeliş goofing around.

Thanks for reading. I hope that next time we post it will be to announce that bookings are properly open. Now I have to get back to it — bye!

So much to do

Winter has come. When we get a north wind in January, it gets colder here than you might imagine. (Certainly colder than I was imagining in 2014.) And again we had some snow this year.

Winter weather

A dusting of snow.

But this winter has been much easier than the last, as we have temporarily moved into room two. It’s been great. We’re pleased to report that straw bale walls insulate just as well as advertised. To give you an idea: in the evenings we use the reverse-cycle air conditioning to get the temperature up to about 21 degrees, then switch it off when we go to bed. Even on the coldest nights, the room is still at about 18 degrees in the morning.

I’m almost reluctant to share the next two shots, as the room doesn’t look as pretty as it did in the previous post. In fact it’s quite cluttered now, as we’ve crammed a lot of furniture in. There’s a bed, a kitchen table with chairs, two sofas, two computer tables, etc. We’re really happy that you can comfortably fit all that in, but of course we’re going to return it to the originally intended minimalist/rustic splendour before the paying guests arrive.

View from the door

Room 2 with all our domestic junk in it.

View from the bed

View when you wake up in the morning.

Also the floor is no longer bare concrete. We went with 30 x 30 cm tiles in a red clay colour with wide grout lines — blatantly stealing a look we’ve seen in old houses in Spain and Italy. Hopefully we’ll get away with it.

Panini with floor tiles

Panini welcoming us home: note the tiles!

The cats are very pleased with the new room, not least because of the aforementioned reverse-cycle air conditioning. Some of them spend the whole day lying on the bed or one of the sofas. I have tried to explain to them that this luxury is only temporary, and by April we will all be back down in the farmhouse, but I am not sure they are listening.

Çezmi

Cezmi takes a break from his building inspector role.

Coco

Coco pretends to be surprised by his own cuteness.

Life is harder for our loyal dogs, who spend their days warning us about approaching tractors or motorbikes on the road below.

Zeytin and Zeliş on duty.

Zeytin and Zeliş on duty.

The building is structurally complete now, so we’re moving on to interior fixtures and fittings. We’ve put the countertop and sink into room two’s little kitchen, but we still need to install a fridge and some cupboards under the counter, and to tile the backsplash.

Sink

Sink going in.

There will be furniture to make, too. After all the carpentry we’ve done on the building itself, making a bed or a coffee table feels very approachable. Here’s something we put together as a base for the bathroom sink.

Bathroom vanity

Chunky bathroom vanity unit.

Speaking of bathrooms, it has been life-changing to be back in a situation where you don’t have to go outside to get to the toilet. That’s not too bad in summer, but it gets old pretty quickly when the temperature is below zero. The en-suite bathroom in room two is not fancy, but it feels big and well-lit and most importantly it’s warm.

Bathroom working

Bathroom: still need to do a mirror, a shelf, some towel racks, etc.

Shower

Shower needs some finishing touches but is fully functional.

The ongoing saga of making all the windows and doors is reaching its conclusion. There is only one doorway left that still needs a frame, and about four or five more doors to do — in the cafe mostly — and then we’re finally done.

Kitchen window

Kitchen window showing the run straight through to the other side. Should lead to a nice breeze when cooking in summer.

Here’s one to file under “you can never have too much storage.” We completed the small attic above the kitchen the other day: the wooden floorboards also form the kitchen ceiling. Taller people may bump their heads on the occasional rafter, but there’s a huge amount of storage space up there. And two internal windows into the cafe area to let some natural light in.

Attic

New attic.

With the prospect of actually having two rentable rooms and a working cafe kitchen soon, it’s pushed us to get back to all the outside stuff: landscaping, drainage, paving the driveway, thinking about where to put cars, etc. We had a backhoe loader in last week and got the guy to smooth out some of our bigger piles of left-over dirt. And also to dig a long drainage trench all the way down from the top of the block to the driveway. Planning to hand-pour a lot of concrete and incorporate a few rocks to try to make the functional ditch into something a bit more attractive. Maybe even make a water feature out of it by pumping water back up to the top. Could be naff, could be wonderful. We will see.

House with drainage ditch

The so-nearly-completed building with a freshly dug drainage ditch in the foreground.

We’ve also started landscaping work at the back of the building, where there’s about four metres of space before the steep slope down to the road. The photo below is very messy, but there’s a few details that may be of interest. You can see our new fusebox on the left, and some short brick retaining walls that will define the garden (don’t worry, we’re going to render and limewash them). That’s our solar hot water system up on a steel tower which makes sure it gets lots of sun but is also hidden away on the north side of the structure. It’s a little ugly right now but when the leaves come back to the fig trees they’ll help hide it.

Landscaping at the back

Landscaping at the back

And finally: we had a couple of days of heavy rain a few weeks back, and all that water led to a little bit of shifting soil on the edge of the driveway. This made us nervous because the nightmare scenario has always been something like a cement truck going too close to the edge and ending up on its side in the farmhouse garden. So just to be safe, we ordered 180 tons of local stone dumped over the edge, to shore things up a bit like you would with a railway track. We lose a little bit of garden at the base, but it was a dark soggy area anyway. Personally I quite like the new look. (I also like ordering 180 tons of something — never gets old.)

Driveway reinforcement

Driveway reinforcement.

 

Plastering and windows

We’ve been working hard lately, trying to get the first two rooms and the cafe habitable before the end of the year. Long days and six-day weeks are taking their toll. And now I sit here trying to think of good ways to describe what we’ve done but I’m conscious that I have to get up at 7am and do it all again, and anyway my brain is crammed only with window frame dimensions and sand vs. lime ratios. So it’s really tempting to just let the photos speak for themselves…

Tiles went on

Tiles went on OK.

Tiling the roof in summer heat was a tough job. Koray had the worst of it; he was placing the tiles while the rest of us only carried them up onto the roof. The results are great though.

Summer visitors enjoying the pool.

Summer visitors enjoying the pool.

Some old friends from Spain came to see us (from left to right, that’s Mar, Julia, Diego, and Manuel). It was great to see them and to take a few days off to socialize. But I fear we’re not the best hosts at the moment.  We are always thinking about the project!

As you’ll see further down, plaster is going on the walls now and so the visible-straw-bale stage is almost entirely behind us. I will miss it though: for a while the interior looked like a warm and inviting barn.

The straw bale stage

The straw bale stage comes to a close.

Mesh attached to the walls, gaps stuffed with fabric.

Plaster preparation: mesh attached to the walls, electrical cables installed, gaps in the straw stuffed with fabric.

Preparing for old-school lathe and plaster in the cafe.

Taking the old-school lathe-and-plaster approach in the cafe.

Plastering was a learning experience, like everything else. The air-powered plaster sprayer we imported from the US worked well at first, but tended to get blocked within about 30 minutes of use. You had to pull it apart to clean it, so it wasn’t a time-efficient approach. In the end we did the first coat of plaster the traditional way: by flicking it on with a trowel.

Early stage plastering: first coat is flicked on with a trowel.

Early stage lime plastering: first coat is flicked on with a trowel. (Note the privacy barrier separating the verandahs for rooms one and two.)

Interior plastering: working up to the desired thickness.

Interior plastering: working up to the desired thickness.

Roughly speaking, the plaster is about three parts sand to one part hydrated lime. Although Berrin has been doing most of the mixing, and she’s not following an exact recipe but instead judges the plaster consistency by eye. The ear is helpful too: you get used to the sound a good mix makes as it sloshes around the mixer.

The second coat is about filling up gaps and bringing the surface out to approximately where you want it. The final coat is made with finer sand and more lime, and gives a beautifully smooth finish. As the final coat dries, there’s much more of a sense of what the completed building will look like.

Smooth final coat of plaster on the south side.

Smooth final coat of plaster on the south side.

Berrin mixing five barrow loads of plaster for Koray.

Berrin mixing five barrow loads of lime plaster for Koray.

Late-stage interior plastering: one more coat to come.

Late-stage interior plastering.

We got some professional carpenters in to give us quotes on doing all the doors and windows. Unfortunately some of the quoted numbers were a bit eye-watering, so we’ve decided to do it ourselves. It will take longer, but we’ll save a lot of money and we know we’ll get the look we want. Right now the workload is split, with Koray and Berrin on plastering while Sirem, her sister Çisem, and I do windows and doors.

Time to build some windows and frames.

Time to build some windows and frames (glass comes later).

My office.

Back in the office.

Çisem after a day of sanding windows and doors.

Çisem after a day of sanding windows and doors.

Window frames going in, with bags of lime in the foreground.

Windows going in, with bags of lime in the foreground.

Another view of the windows; you can see what the finished product will look like now.

Another view of the windows; you can see what the finished product will look like now.

Lathe and plaster success!

Lathe and plaster success!

So that’s where we are now. There are still a lot of jobs left to do: floor tiles, bathrooms, kitchen fitting, etc. But the end is in sight. We hope to be finished and open for our first guests early in 2017. (At which point we can start on the second building, of course.)

Zeliş gazing wistfully into the distance.

Zeliş gazing wistfully into the distance.

Weather still good but turning colder: the autumn sunsets begin.

Weather still good but turning colder: autumn sunsets begin.

 

 

A roof and some walls

So, we had a coup. An attempted one, anyway. Thank you to the many friends and family members who checked in to see whether we were OK at the time. It was a scary and confusing 24 hours of news coverage. But for us that’s all it was: a day of watching TV and browsing the web, trying to figure out what was going on. At times like that it’s nice to live in a small town far from significant buildings and infrastructure.

It was a sad day for Turkey, with around 250 people killed. And in the aftermath a lot of young soldiers are potentially facing long jail sentences, while many people have lost their jobs for alleged links to the shadowy Gülenist movement. All of this comes on top of the ongoing troubles in the southeast of the country, a terrorist attack at Istanbul airport, and so on. Interesting times indeed.

Of course we hope that the situation will improve. But there’s not a great deal we can do about it on a personal level, and the truth is it hasn’t affected day-to-day life around here at all. So we have just been pushing on with construction work as usual.

A big recent milestone for us was getting the roof completely covered with wooden planks. (The planks are there to support the waterproof membrane and the roof tiles, both still to come.)  As you can see in some of the photos below, the planks shrink a little after being nailed down, so there are some gaps that let light through. But it still feels much more like a building now that it has a covered roof.

Koray working on the roof.

Koray sawing planks on the roof.

Verandah coming together.

Verandah coming together.

Roof planks completed.

Roof planks completed.

The pool has been a lifesaver, making working through the hot days of summer much more bearable. Which I guess is a good sign of its future popularity. One of our little pleasures is a drink by the pool in the evenings. The water is so warm that you don’t really want to get out.

Evening drinks by the pool.

Evening drinks by the pool.

The roof at night; lights of Germencik in the background.

The new roof at night; lights of Germencik in the background.

And now a photo of me looking grumpy in the heat.  (Sirem insisted that I include it.) It looks like I should probably go for a swim and cheer up.

Portrait in 40 degree heat.

Portrait at 40 degrees C.

In parallel with the roof work, we’ve been building up the straw bale walls. It’s a mixed bag of a job: sometimes it’s easy and fast, like when you have a long run where you can use whole bales. But then you get to a fiddly bit in the corner or between two windows, and there’s a lot of splitting and re-tying the bales, which can get tedious. And especially when you have to lift bales up above your head for the higher sections, you end up wearing and breathing a lot of straw which is not the nicest feeling in the world. On the plus side, you do get to play with the chainsaw, which is essential for carving the bales so they fit neatly around the building’s wooden frame.

Straw bale interior.

Straw bale interior.

Essential equipment for shaping bales.

Essential equipment for shaping bales.

Roof from inside, with ceiling test panel.

Roof from inside. The white part is a test for one of our ceiling ideas: going to need something to hide all the insulation between the rafters.

There was one final part of the structure that we’d been putting off for a while: an overhanging verandah for the cafe area at the west end of the building. It’s mostly done now. There were a few steps involved: concrete bases for big 15cm x 15cm columns, getting the support beam up on top of the columns, then getting the 5-metre rafters up. That’s where we are in the “after” photo below. And still to come are planks, guttering, waterproofing, and tiles, just like the rest of the roof.

Front of the cafe area.

Before photo: the front of the cafe area.

And now with added verandah rafters.

After photo: the verandah will add shade for plenty of outside tables.

It’s no surprise that summer has brought more visitors than winter did. Some weeks back we hosted Elisabeth and Max, some friends from Germany via Southampton. They got very involved in the construction work and we’re grateful for their help. Elisabeth and Max (and some co-conspirators; looking at you, Alex) also have a fine tradition of candid photography that truly captures the modern, relaxed German style. So who were we to refuse them?

German efficiency.

German efficiency.

The next batch of visitors were my mum and dad, Diane and Barry. They were last here exactly a year ago, when nothing had happened yet up in the orchard. (And previously they were our very first visitors, a year before that.)  So, once more, it was great to see our recent progress through their eyes. Dad especially got involved in the building work, and mum played an important pool-testing role. We really appreciate their help.

Mum and Dad visiting.

Mum and Dad visiting, checking out their soon-to-be-favourite area of the cafe.

Animal lovers, you thought I had forgotten you, didn’t you? Not a chance. Apologies that it always seems to be the same animals in these photos: it happens because some of them have pre-emptively adopted the building site as their new home, while others live down in the old farmhouse and thus keep away from the cameras.

Cat.

Sookie being sweet, in between psychotic episodes.

Dog.

Tito feeling a bit tired and sorry for himself on a hot day.

We were originally expecting our roof tiles several weeks ago, but there were delays from the supplier’s end. Apparently they needed to make a special batch just for us, because generally they don’t sell a lot of roof tiles in the middle of the summer. Apparently no-one but us is foolish enough to do roofing work in the heat. We are currently finding out just how sensible this accepted wisdom is: photos of the tiled roof to follow next time, I hope.

Roof tiles arrived at last.

Roof tiles arrived at last.

Roof with temporary plastic in case of rain (unlikely).

Roof ready for tiling. That’s a temporary plastic cover in case of rain.

Finally, we want to dedicate this post to our great friend Jesús Palomo Muñoz (1967-2016). He was a fantastic person who has left us all much too soon. We will miss him.

Roof started, bales arriving

There will be no food photos, look-at-this-sunset photos, or archaeology photos in this post. (Apologies if any of those are your thing.) Around here lately it’s all construction, all the time.

There will of course be some cat and dog photos. I am not a monster.

Main beam going up

One section of the main beam in place

Previously we showed you the central spine of the building: a series of beams, sitting up on columns, that help to hold up the roof. These beams and posts were only half the story though. Another series of even bigger beams has to go up on top of the first one in order to form the ridge of the roof.  The longest section is about 5.5 metres long, and getting all that wood up there was probably the toughest and scariest job we’ve done so far.

Rainbows on a cloudy day

Main beam complete, plus a rare summer storm with rainbows

In the second photo you can see how the ridge beam looked once it was secured in place. You can also see that we get the occasional dramatic summer storm.

And from another angle it’s clear how close the building is to the pool. We’re hoping that will turn out to be a good thing as the roof itself, with its wide eaves, will provide some much-needed shade on the pool terrace in the late afternoons.

Ready for rafters

Sirem and Koray taking a break by the pool; ridge beam in the background

With the ridge beam up we were ready to start work on the roof, which meant a final big timber delivery. Here’s a stack of six-metre planks ready to be used as rafters.

Rafters delivered

Rafters delivered

The rafters need diagonal cuts on each end to get them to the right length, plus a “bird’s mouth” cut to make sure they sit nicely on the top rail of the wall framing. We’ve also been sanding the bits that are going to remain visible once the insulation and the ceiling panels go in — it would be a shame to hide all that nice wood behind a plain white ceiling.

First rafters up

Evening shot of the first few rafters installed

Coming together

The roof structure starting to take shape

Cezmi approves

Of course Cezmi went up on the roof to inspect it

The roof isn’t finished yet, but it’s already made a big difference to the site.  Even a partial roof provides a lot of shade and the rising summer temperatures are easier to bear now we can get out of the sun.  The cats and dogs have noticed this too and are hanging around even more than usual.

Zeytin is always helpful

Zeytin is always helpful

Cezmi continues his supervisory role

Cezmi takes a break from his supervisory role

Tea break

Tea breaks are much more pleasant in the shade

It’s harvest time for wheat farmers in the area, so we’ve been buying straw bales while they’re cheap.  So far we’re paying 9 lira, or about £2.15 per bale, delivered. (Apparently if you leave it too late in the year, the price goes up quite a lot.)  The first batch was 80 bales that came up on the back of a tractor trailer, but we’re going to need about 500 in total for the building.  And another 500 later for buildings two and three, but that’s a future problem.

Straw bales arriving

Straw bales arriving

For now we’re storing the bales in what will one day be the cafe kitchen.  You can see some ceiling joists in the top of the shot, as the kitchen will have a little storage loft above it.

Straw bales stored in the kitchen

Straw bales stored in the kitchen

Here’s a view from inside the cafe area, looking over at the doorway to the kitchen. Those two interior window structures on the right will eventually become the bar (a very important feature).

The bar

Looking across at the bales via the kitchen door and the bar

Sookie, mother of kittens, has taken to disappearing on mysterious multi-day journeys now that the weather is warm. She decided that sleeping on straw bales was a good enough reason to come home though. It’s always a relief to see her back safely.

Sookie returns

Sookie returns

We decided on old-school wooden planks over OSB or plywood for the roof.  One reason is that real wood will hold up better if there is ever a leak. Another is that sections like the verandah roof and under the eaves (where there won’t be any insulation or ceiling panels) will look a lot nicer in real wood. And the cost worked out about the same as OSB anyway.

Roof planks going on

Roof planks going on

View from the pool

Another view from the pool area

After all the rafters and planks are up, the next steps are gutters, waterproof membrane, and ceramic tiles, in that order. Then we can get to the fun part of stacking those straw bale walls.

Framing and planting

Apparently some readers worry that there won’t be any animal photos in a new blog entry. So this time I thought I would end the suspense and get the animal photo out of the way early. (Only one this week, sorry.) Here is Cezmi — our construction site manager in cat form — sampling the water of the swimming pool.

Cezmi by the pool

Cezmi by the pool

So we’re working pretty hard at the moment, doing long days six days a week. Rain is our only interruption, and it’s getting to the time of year when rain is a rare event. A couple of Sundays ago we gave ourselves the day off and went for a drive in the mountains. Here are Sirem’s parents posing at the side of the road. This spot is about twenty minutes up into the hills behind our house.

Sirem's mum and dad, Nadire and Dogan

Sirem’s mum and dad, Nadire and Doğan. We wouldn’t be making so much progress if they weren’t doing a lot of the cooking and shopping for us — thanks!

We had lunch in the beautiful village of Birgi, right next door to the ski resort at Ödemiş, about 80km northeast. And did a tour of the local garden centres, but more on that later.

View of Birgi

View of Birgi

Traditional Turkish architecture in Birgi

Traditional architecture in Birgi

The building work is progressing well. We’re roughly on schedule, but can’t afford to relax as there’s still a lot to do if we want to be ready for our first guests by the end of summer.

The first phase of the work was getting the bathroom walls up. (They’re made of brick so we don’t have to worry about water from the showers ever penetrating the straw bale walls.) We’ve learned to lay bricks pretty well, I think, although we are nowhere near as fast as Koray.

Bathroom brickwork

Bathroom brickwork and improvised sunshade

The next step was taking the 10cm x 10cm lengths of treated timber and bolting them down to the concrete slab to act as a secure base plate for the timber framing. This went a lot easier than I thought it would. Luckily we have a beast of a drill that makes holes in the concrete without any fuss at all. We then used a two-part epoxy to glue 14mm threaded rod into the holes. Incredible stuff and it’s all rock-solid now.

Putting down the treated timber base plates

Putting down the treated timber base plates: you can start to see the floor plan

After that it was time for the timber framing to begin in earnest. Of course it’s not something we’ve done before, but after watching some videos on YouTube how hard can it be?  :)

ARE YOU NOT ACCOMMODATED?

ARE YOU NOT ACCOMMODATED?

The walls have gone up fast, although there are still details to take care of, like completing the internal stud walls and finishing all the window sill and lintel boxes. We’ve currently moved on to the spine of the building and put up some columns and beams that will help hold up the roof. Lots of this timber will be exposed in the finished build, so we took a bit more time with it and sanded each piece before it went up.

...

View of the exposed column-and-beam arrangement in room 1, looking through to the kitchen and cafe beyond. Please disregard the blocks of scrap timber temporarily holding it together.

...

The spine of the building, looking the other way towards the pool. Note that the ridge of the roof will be about 1.6 metres higher again.

...

Detail of a wooden column with T-bar support for the beams

...

Our favourite local mountain shot through the framing

There has also been some progress on the landscaping front. The gardens still look a bit dry and sparse but hopefully as everything matures they will become beautiful.

...

The fruits of a trip to the garden centre

...

Trying to make the most of the slope by building lots of small gardens on different levels

...

Kumquat and some kind of grass thing

...

Bougainvillea that will one day be encouraged to wrap itself around a verandah post

...

Lily in the sun

The pool railings are finished and installed: welding by Koray, painting by Sirem. We like how the ferforje (curly bits) turned out. Ornate, but not too fiddly.

...

New railings in place

...

Terracotta pots seem to suit the pool area

Most of our photos are taken from the south side of the building site, perhaps because that’s where the driveway puts you as you come up the hill. Here are a couple of shots from the north side that give a different perspective. The first one is a panorama showing the current condition of the pool area. The seating on the left is going to be great once we render the brickwork and build a pavilion roof: it’s possibly a bit too sunny at the moment.

Pano

Pool panorama

This one is taken from across the road on the opposite hill. You can see the whole project from here. From left to right: slab for our house, slab for rooms 3 and 4, the pool area (behind the poplar), timber frame under construction, and the driveway.

...

Project overview shot

And finally, I know I take too many photos of this mountain, but forgive me.  It’s hard to resist, and I don’t get out much.

...

Mount Mycale and Mount Thorax in changeable morning light

 

Deliveries

Let me warn you up front: this blog post, and probably future posts for a while, are going to be variations on the theme of “look at this thing we made!”

With that said… I am learning, too late in life, that a huge part of construction is just moving stuff around.  Here are three of our most recent deliveries, more or less neatly stacked.

Bricks

Bricks

Steel

Steel

Timber

Timber

That last one is not just a gratuitous night-time shot: the timber really did arrive late in the evening.  In fact it was delayed for a week or so longer than we were expecting.  The 10cm x 10cm pieces on the right are chemically treated to resist moisture, and those took a while to get hold of.

It wasn’t really a problem though.  We have so much to do if we’re going to hit our target of real guests by late summer, so we just worked on some landscaping instead of timber framing.  This next shot is yet another Sketchup model showing our plans for around the pool.  A steel railing to stop people falling off the terrace after one Tuborg too many, and on the other side a little pavilion surrounded by gardens and incorporating two built-in seating areas.  In summer we’ll hang some canvas or cotton at the front of the seating area to keep people in the shade during the hot afternoons.

Some of the planned landscaping around the pool.

Some of the planned landscaping around the pool.  The shadows are as they would be on the summer solstice at around 4pm.

Sharp-eyed readers will note that we haven’t really decided what’s happening at the back of the pool: probably a wooden fence with a lattice to grow climbing plants on.  It would be nice to have a rendered and limewashed brick wall but we’re thinking it’s a bit too close to the edge of the hillside for a heavy wall to be 100% safe.  Anyway, here’s the progress we’ve made in the last week on the seating area.

Poolside seating pavilion, under construction

Poolside seating pavilion, under construction

Koray, the guy you saw welding a door in the previous post, is now working with us full-time.  We really needed some more people power if we’re serious about opening the first two rooms this summer.   One of the first things he did for us was to install that door.

The door Koray was welding in the last post, now safely installed.

The machine room door, now safely installed.  (I did the twirly bits, honest.)

Koray has also done great work on building a stone retaining wall up the left side of the driveway, as well as a dozen other things.

Stone retaining wall on driveway nearly finished

Stone retaining wall on driveway nearly finished

Which reminds me, a big thank-you to my cousin Stephanie and her partner Mick.  They visited a couple of weeks back and helped carry a lot of the stones into position.  (We are officially becoming terrible hosts: “Had enough breakfast?  All done?  OK, great, now carry this 40 kilo rock.”)

At the foot of the stone wall there’s a concrete gutter.  Previously this ran into a large hole that connected to the storm-water drain.  Health and safety concerns suggest we shouldn’t leave a large hole lying around long-term, so I got to improve my bricklaying and rendering skills by building a drain cover.   We tried using powdered dyes to colour the rendering coat: two scoops of red, four scoops of yellow, and one scoop of black.  Not too bad a result if you like the Santa Fe adobe look.

Here's one I made earlier: drain cover

Here’s one I made earlier: drain cover.  Note modernist grille made by welding scrap rebar pieces together.

Here are a couple of photos of things we’re making with all those deliveries.  The bricks are for parts of the guest bathroom walls.  We’re still committed to straw bale, but we lost our nerve at the thought of the waterproofing needed to be sure that a straw bale in the wall behind a shower would never get wet.  So the external walls of the bathroom, and the wall between the two bathrooms, will be brick.  Still, they’re big 30 x 20 cm bricks with some air holes in them, there’ll be a double wall, and the 10cm gap between the inner and outer wall will be filled with polystyrene insulation.  It won’t quite be as good as straw, but should still be reasonably well insulated.

The first two guest bathrooms laid out with bricks

The first two guest bathrooms laid out with bricks.   Each bathroom is about 3 metres by 2 metres: big enough for everyone?

The steel is for pool terrace railings as shown in the Sketchup picture above.  They’re nearly done; they just need some twisty decorative bits (“ferforje” in Turkish) and a coat of black paint and they’re ready to go in.

Pool terrace railings under construction

Pool terrace railings under construction

And all this welding seems to be catching:  Sirem has now joined the party.  It looks like she’s been doing it for years, doesn’t it?

Sirem getting in on the welding action.

Sirem getting in on the welding action.  (Thanks to Stephanie for the photo.)

We’re still some distance away from the straw bale and plastering stage, but we’ve done some more testing recently to decide between clay plaster (which has the benefit of basically being free) and lime plaster, which stands up to moisture a lot better.  I think we’ve decided on the lime plaster solution, but it’s a shame to have to say no to the clay as the texture is really nice.

Plaster testing: three coats of mud plaster

Plaster testing: three coats of clay plaster on a straw bale (second coat still showing at the top there)

Plaster testing: two coats of lime plaster on a straw bale

Plaster testing: two coats of lime plaster on a straw bale

The pool has been properly filled and we are pleased to report that it didn’t fall over or spring a leak.  There was even a warm day in late February when I was stupid enough to try a first swim.  The pool was very nice but the water needs a bit more sun on it, I think.

What the pool looks like now

What the pool looks like now

And finally, a few shots of plants and animals to show that it is not quite all-construction, all-the-time.

Spring returns: almond blossoms in the neighbour's garden

Spring returns: almond blossoms in the neighbour’s garden

Zeliş relaxing

Zeliş relaxing

Zeytin is in a good mood, as usual.

Zeytin is in a good mood, as usual.

Cezmi, Sirem's sister's cat, maybe now our  cat, who believes he is the construction site manager

Cezmi, Sirem’s sister’s cat, maybe now our cat, who believes he is the construction site manager

Thanks for reading!