The furniture update

Quick disclaimer: we are not as close to being finished as some of these photos make it look. But we are getting closer!

Shortly we’ll have to decide which online booking sites we’re going to use. And we’ll need to make our listings look as good as possible. We could take bookings right now for, say, April 2017, but one problem is all our photos (for obvious reasons) make the place look like a building site. With this in mind, some friends had a great idea: why not borrow some furniture and take a few photos that show how things are going to look in a few months time when we’re actually ready for guests?

 

Sun lounges by the pool

Sun lounges by the pool

So we did. The furniture came from a few different places. We concentrated mostly on getting the pool area and the interior of room two to look good. Big thanks to Sirem’s mum Nadire, her sister Çisem, and her cousin Mevlüde for all the work on the beautiful quilt for the bed.

Interior with bed

Interior with bed. (That’s the bathroom door on the left, but sadly the bathroom was in no state to be photographed yet.)

Interior with door

Interior with column and front door.

Interior with sofa

Interior with sofa.

You’ve probably spotted the lack of floor tiles by now but hopefully we got away with it. The raw concrete slab doesn’t look great but I’d like to think it doesn’t take anything away from the rest of the decor.

Breakfast on the verandah perhaps?

Breakfast on the verandah perhaps?

It was good to put some real tables and chairs into the cafe: very reassuring to see that seating sixteen or twenty people in the dining area is completely realistic. Although we expect most people will want to sit outside on the terrace in the summer, it’s good to have seating space for cold or rainy days.

Cafe dining area

Cafe dining area

Originally it was just going to be a door and a sort-of serving hatch connecting the kitchen with the cafe, but that looked like a missed opportunity to have a proper bar. Years of visiting British pubs must have unconsciously left a mark as we seem to have reproduced one.

We have accidentally built a pub.

We have accidentally built a pub.

That thing just to the right of the bar, on the wall near the light switches, is our straw bale “truth window”. The idea is to leave a window opening in the interior plaster so people can see that there really are straw bales inside the wall. I didn’t quite get this convention at first, but now that we have seen the bales disappear from view, I understand why everyone does it.

Straw bale "truth window".

Straw bale “truth window”.

Garden doing OK.

Garden doing OK.

We were happy with the furnished photos but of course the furniture all had to be given back to the people we borrowed it from and building work had to go on. One big job recently has been putting insulation into the ceiling, between rafters, and then concealing it with interlocking wooden planks. I had been a bit worried that an all-timber ceiling might make the room look a bit like the inside of a sauna, but I’m happy with the result. See what you think.

Insulation and timber paneling going on the ceiling.

Looking straight up at insulation and timber paneling going between the rafters.

Night-time shot of the new ceiling.

A shot of the new ceiling.

No point having windows unless you eventually put some glass in them, and thus we contacted a local glass factory with good prices on double glazing. The only downside was they don’t deliver, so we had to lay all that glass in the back of the truck, wrapped in blankets and bubble wrap, and drive home very carefully. Nothing broke — yay!

Glass for windows and mirrors has arrived.

Glass for windows and mirrors has arrived.

Build your own windows for fun and profit.

Build your own windows for fun and profit.

Right, and in conclusion: I would write more but the truth is I need to sleep so I can get up in the morning and build more things. Here’s your animal photo as required by popular demand (something a bit different today).

Sorry, no cat or dog photos. Will you accept a tortoise?

Sorry, no cat or dog photos. Will you accept a tortoise?

And I am going to keep posting photos of that mountain until I feel I have got the definitive one. Quite happy with this shot though as it makes it look like we live a few kilometres from Mount Doom.

Sunset panorama from the highest point on our block.

Sunset panorama from the highest point on our block. (Zoomable full-size version here.)

Plastering and windows

We’ve been working hard lately, trying to get the first two rooms and the cafe habitable before the end of the year. Long days and six-day weeks are taking their toll. And now I sit here trying to think of good ways to describe what we’ve done but I’m conscious that I have to get up at 7am and do it all again, and anyway my brain is crammed only with window frame dimensions and sand vs. lime ratios. So it’s really tempting to just let the photos speak for themselves…

Tiles went on

Tiles went on OK.

Tiling the roof in summer heat was a tough job. Koray had the worst of it; he was placing the tiles while the rest of us only carried them up onto the roof. The results are great though.

Summer visitors enjoying the pool.

Summer visitors enjoying the pool.

Some old friends from Spain came to see us (from left to right, that’s Mar, Julia, Diego, and Manuel). It was great to see them and to take a few days off to socialize. But I fear we’re not the best hosts at the moment.  We are always thinking about the project!

As you’ll see further down, plaster is going on the walls now and so the visible-straw-bale stage is almost entirely behind us. I will miss it though: for a while the interior looked like a warm and inviting barn.

The straw bale stage

The straw bale stage comes to a close.

Mesh attached to the walls, gaps stuffed with fabric.

Plaster preparation: mesh attached to the walls, electrical cables installed, gaps in the straw stuffed with fabric.

Preparing for old-school lathe and plaster in the cafe.

Taking the old-school lathe-and-plaster approach in the cafe.

Plastering was a learning experience, like everything else. The air-powered plaster sprayer we imported from the US worked well at first, but tended to get blocked within about 30 minutes of use. You had to pull it apart to clean it, so it wasn’t a time-efficient approach. In the end we did the first coat of plaster the traditional way: by flicking it on with a trowel.

Early stage plastering: first coat is flicked on with a trowel.

Early stage lime plastering: first coat is flicked on with a trowel. (Note the privacy barrier separating the verandahs for rooms one and two.)

Interior plastering: working up to the desired thickness.

Interior plastering: working up to the desired thickness.

Roughly speaking, the plaster is about three parts sand to one part hydrated lime. Although Berrin has been doing most of the mixing, and she’s not following an exact recipe but instead judges the plaster consistency by eye. The ear is helpful too: you get used to the sound a good mix makes as it sloshes around the mixer.

The second coat is about filling up gaps and bringing the surface out to approximately where you want it. The final coat is made with finer sand and more lime, and gives a beautifully smooth finish. As the final coat dries, there’s much more of a sense of what the completed building will look like.

Smooth final coat of plaster on the south side.

Smooth final coat of plaster on the south side.

Berrin mixing five barrow loads of plaster for Koray.

Berrin mixing five barrow loads of lime plaster for Koray.

Late-stage interior plastering: one more coat to come.

Late-stage interior plastering.

We got some professional carpenters in to give us quotes on doing all the doors and windows. Unfortunately some of the quoted numbers were a bit eye-watering, so we’ve decided to do it ourselves. It will take longer, but we’ll save a lot of money and we know we’ll get the look we want. Right now the workload is split, with Koray and Berrin on plastering while Sirem, her sister Çisem, and I do windows and doors.

Time to build some windows and frames.

Time to build some windows and frames (glass comes later).

My office.

Back in the office.

Çisem after a day of sanding windows and doors.

Çisem after a day of sanding windows and doors.

Window frames going in, with bags of lime in the foreground.

Windows going in, with bags of lime in the foreground.

Another view of the windows; you can see what the finished product will look like now.

Another view of the windows; you can see what the finished product will look like now.

Lathe and plaster success!

Lathe and plaster success!

So that’s where we are now. There are still a lot of jobs left to do: floor tiles, bathrooms, kitchen fitting, etc. But the end is in sight. We hope to be finished and open for our first guests early in 2017. (At which point we can start on the second building, of course.)

Zeliş gazing wistfully into the distance.

Zeliş gazing wistfully into the distance.

Weather still good but turning colder: the autumn sunsets begin.

Weather still good but turning colder: autumn sunsets begin.

 

 

A roof and some walls

So, we had a coup. An attempted one, anyway. Thank you to the many friends and family members who checked in to see whether we were OK at the time. It was a scary and confusing 24 hours of news coverage. But for us that’s all it was: a day of watching TV and browsing the web, trying to figure out what was going on. At times like that it’s nice to live in a small town far from significant buildings and infrastructure.

It was a sad day for Turkey, with around 250 people killed. And in the aftermath a lot of young soldiers are potentially facing long jail sentences, while many people have lost their jobs for alleged links to the shadowy Gülenist movement. All of this comes on top of the ongoing troubles in the southeast of the country, a terrorist attack at Istanbul airport, and so on. Interesting times indeed.

Of course we hope that the situation will improve. But there’s not a great deal we can do about it on a personal level, and the truth is it hasn’t affected day-to-day life around here at all. So we have just been pushing on with construction work as usual.

A big recent milestone for us was getting the roof completely covered with wooden planks. (The planks are there to support the waterproof membrane and the roof tiles, both still to come.)  As you can see in some of the photos below, the planks shrink a little after being nailed down, so there are some gaps that let light through. But it still feels much more like a building now that it has a covered roof.

Koray working on the roof.

Koray sawing planks on the roof.

Verandah coming together.

Verandah coming together.

Roof planks completed.

Roof planks completed.

The pool has been a lifesaver, making working through the hot days of summer much more bearable. Which I guess is a good sign of its future popularity. One of our little pleasures is a drink by the pool in the evenings. The water is so warm that you don’t really want to get out.

Evening drinks by the pool.

Evening drinks by the pool.

The roof at night; lights of Germencik in the background.

The new roof at night; lights of Germencik in the background.

And now a photo of me looking grumpy in the heat.  (Sirem insisted that I include it.) It looks like I should probably go for a swim and cheer up.

Portrait in 40 degree heat.

Portrait at 40 degrees C.

In parallel with the roof work, we’ve been building up the straw bale walls. It’s a mixed bag of a job: sometimes it’s easy and fast, like when you have a long run where you can use whole bales. But then you get to a fiddly bit in the corner or between two windows, and there’s a lot of splitting and re-tying the bales, which can get tedious. And especially when you have to lift bales up above your head for the higher sections, you end up wearing and breathing a lot of straw which is not the nicest feeling in the world. On the plus side, you do get to play with the chainsaw, which is essential for carving the bales so they fit neatly around the building’s wooden frame.

Straw bale interior.

Straw bale interior.

Essential equipment for shaping bales.

Essential equipment for shaping bales.

Roof from inside, with ceiling test panel.

Roof from inside. The white part is a test for one of our ceiling ideas: going to need something to hide all the insulation between the rafters.

There was one final part of the structure that we’d been putting off for a while: an overhanging verandah for the cafe area at the west end of the building. It’s mostly done now. There were a few steps involved: concrete bases for big 15cm x 15cm columns, getting the support beam up on top of the columns, then getting the 5-metre rafters up. That’s where we are in the “after” photo below. And still to come are planks, guttering, waterproofing, and tiles, just like the rest of the roof.

Front of the cafe area.

Before photo: the front of the cafe area.

And now with added verandah rafters.

After photo: the verandah will add shade for plenty of outside tables.

It’s no surprise that summer has brought more visitors than winter did. Some weeks back we hosted Elisabeth and Max, some friends from Germany via Southampton. They got very involved in the construction work and we’re grateful for their help. Elisabeth and Max (and some co-conspirators; looking at you, Alex) also have a fine tradition of candid photography that truly captures the modern, relaxed German style. So who were we to refuse them?

German efficiency.

German efficiency.

The next batch of visitors were my mum and dad, Diane and Barry. They were last here exactly a year ago, when nothing had happened yet up in the orchard. (And previously they were our very first visitors, a year before that.)  So, once more, it was great to see our recent progress through their eyes. Dad especially got involved in the building work, and mum played an important pool-testing role. We really appreciate their help.

Mum and Dad visiting.

Mum and Dad visiting, checking out their soon-to-be-favourite area of the cafe.

Animal lovers, you thought I had forgotten you, didn’t you? Not a chance. Apologies that it always seems to be the same animals in these photos: it happens because some of them have pre-emptively adopted the building site as their new home, while others live down in the old farmhouse and thus keep away from the cameras.

Cat.

Sookie being sweet, in between psychotic episodes.

Dog.

Tito feeling a bit tired and sorry for himself on a hot day.

We were originally expecting our roof tiles several weeks ago, but there were delays from the supplier’s end. Apparently they needed to make a special batch just for us, because generally they don’t sell a lot of roof tiles in the middle of the summer. Apparently no-one but us is foolish enough to do roofing work in the heat. We are currently finding out just how sensible this accepted wisdom is: photos of the tiled roof to follow next time, I hope.

Roof tiles arrived at last.

Roof tiles arrived at last.

Roof with temporary plastic in case of rain (unlikely).

Roof ready for tiling. That’s a temporary plastic cover in case of rain.

Finally, we want to dedicate this post to our great friend Jesús Palomo Muñoz (1967-2016). He was a fantastic person who has left us all much too soon. We will miss him.

Roof started, bales arriving

There will be no food photos, look-at-this-sunset photos, or archaeology photos in this post. (Apologies if any of those are your thing.) Around here lately it’s all construction, all the time.

There will of course be some cat and dog photos. I am not a monster.

Main beam going up

One section of the main beam in place

Previously we showed you the central spine of the building: a series of beams, sitting up on columns, that help to hold up the roof. These beams and posts were only half the story though. Another series of even bigger beams has to go up on top of the first one in order to form the ridge of the roof.  The longest section is about 5.5 metres long, and getting all that wood up there was probably the toughest and scariest job we’ve done so far.

Rainbows on a cloudy day

Main beam complete, plus a rare summer storm with rainbows

In the second photo you can see how the ridge beam looked once it was secured in place. You can also see that we get the occasional dramatic summer storm.

And from another angle it’s clear how close the building is to the pool. We’re hoping that will turn out to be a good thing as the roof itself, with its wide eaves, will provide some much-needed shade on the pool terrace in the late afternoons.

Ready for rafters

Sirem and Koray taking a break by the pool; ridge beam in the background

With the ridge beam up we were ready to start work on the roof, which meant a final big timber delivery. Here’s a stack of six-metre planks ready to be used as rafters.

Rafters delivered

Rafters delivered

The rafters need diagonal cuts on each end to get them to the right length, plus a “bird’s mouth” cut to make sure they sit nicely on the top rail of the wall framing. We’ve also been sanding the bits that are going to remain visible once the insulation and the ceiling panels go in — it would be a shame to hide all that nice wood behind a plain white ceiling.

First rafters up

Evening shot of the first few rafters installed

Coming together

The roof structure starting to take shape

Cezmi approves

Of course Cezmi went up on the roof to inspect it

The roof isn’t finished yet, but it’s already made a big difference to the site.  Even a partial roof provides a lot of shade and the rising summer temperatures are easier to bear now we can get out of the sun.  The cats and dogs have noticed this too and are hanging around even more than usual.

Zeytin is always helpful

Zeytin is always helpful

Cezmi continues his supervisory role

Cezmi takes a break from his supervisory role

Tea break

Tea breaks are much more pleasant in the shade

It’s harvest time for wheat farmers in the area, so we’ve been buying straw bales while they’re cheap.  So far we’re paying 9 lira, or about £2.15 per bale, delivered. (Apparently if you leave it too late in the year, the price goes up quite a lot.)  The first batch was 80 bales that came up on the back of a tractor trailer, but we’re going to need about 500 in total for the building.  And another 500 later for buildings two and three, but that’s a future problem.

Straw bales arriving

Straw bales arriving

For now we’re storing the bales in what will one day be the cafe kitchen.  You can see some ceiling joists in the top of the shot, as the kitchen will have a little storage loft above it.

Straw bales stored in the kitchen

Straw bales stored in the kitchen

Here’s a view from inside the cafe area, looking over at the doorway to the kitchen. Those two interior window structures on the right will eventually become the bar (a very important feature).

The bar

Looking across at the bales via the kitchen door and the bar

Sookie, mother of kittens, has taken to disappearing on mysterious multi-day journeys now that the weather is warm. She decided that sleeping on straw bales was a good enough reason to come home though. It’s always a relief to see her back safely.

Sookie returns

Sookie returns

We decided on old-school wooden planks over OSB or plywood for the roof.  One reason is that real wood will hold up better if there is ever a leak. Another is that sections like the verandah roof and under the eaves (where there won’t be any insulation or ceiling panels) will look a lot nicer in real wood. And the cost worked out about the same as OSB anyway.

Roof planks going on

Roof planks going on

View from the pool

Another view from the pool area

After all the rafters and planks are up, the next steps are gutters, waterproof membrane, and ceramic tiles, in that order. Then we can get to the fun part of stacking those straw bale walls.

Framing and planting

Apparently some readers worry that there won’t be any animal photos in a new blog entry. So this time I thought I would end the suspense and get the animal photo out of the way early. (Only one this week, sorry.) Here is Cezmi — our construction site manager in cat form — sampling the water of the swimming pool.

Cezmi by the pool

Cezmi by the pool

So we’re working pretty hard at the moment, doing long days six days a week. Rain is our only interruption, and it’s getting to the time of year when rain is a rare event. A couple of Sundays ago we gave ourselves the day off and went for a drive in the mountains. Here are Sirem’s parents posing at the side of the road. This spot is about twenty minutes up into the hills behind our house.

Sirem's mum and dad, Nadire and Dogan

Sirem’s mum and dad, Nadire and Doğan. We wouldn’t be making so much progress if they weren’t doing a lot of the cooking and shopping for us — thanks!

We had lunch in the beautiful village of Birgi, right next door to the ski resort at Ödemiş, about 80km northeast. And did a tour of the local garden centres, but more on that later.

View of Birgi

View of Birgi

Traditional Turkish architecture in Birgi

Traditional architecture in Birgi

The building work is progressing well. We’re roughly on schedule, but can’t afford to relax as there’s still a lot to do if we want to be ready for our first guests by the end of summer.

The first phase of the work was getting the bathroom walls up. (They’re made of brick so we don’t have to worry about water from the showers ever penetrating the straw bale walls.) We’ve learned to lay bricks pretty well, I think, although we are nowhere near as fast as Koray.

Bathroom brickwork

Bathroom brickwork and improvised sunshade

The next step was taking the 10cm x 10cm lengths of treated timber and bolting them down to the concrete slab to act as a secure base plate for the timber framing. This went a lot easier than I thought it would. Luckily we have a beast of a drill that makes holes in the concrete without any fuss at all. We then used a two-part epoxy to glue 14mm threaded rod into the holes. Incredible stuff and it’s all rock-solid now.

Putting down the treated timber base plates

Putting down the treated timber base plates: you can start to see the floor plan

After that it was time for the timber framing to begin in earnest. Of course it’s not something we’ve done before, but after watching some videos on YouTube how hard can it be?  :)

ARE YOU NOT ACCOMMODATED?

ARE YOU NOT ACCOMMODATED?

The walls have gone up fast, although there are still details to take care of, like completing the internal stud walls and finishing all the window sill and lintel boxes. We’ve currently moved on to the spine of the building and put up some columns and beams that will help hold up the roof. Lots of this timber will be exposed in the finished build, so we took a bit more time with it and sanded each piece before it went up.

...

View of the exposed column-and-beam arrangement in room 1, looking through to the kitchen and cafe beyond. Please disregard the blocks of scrap timber temporarily holding it together.

...

The spine of the building, looking the other way towards the pool. Note that the ridge of the roof will be about 1.6 metres higher again.

...

Detail of a wooden column with T-bar support for the beams

...

Our favourite local mountain shot through the framing

There has also been some progress on the landscaping front. The gardens still look a bit dry and sparse but hopefully as everything matures they will become beautiful.

...

The fruits of a trip to the garden centre

...

Trying to make the most of the slope by building lots of small gardens on different levels

...

Kumquat and some kind of grass thing

...

Bougainvillea that will one day be encouraged to wrap itself around a verandah post

...

Lily in the sun

The pool railings are finished and installed: welding by Koray, painting by Sirem. We like how the ferforje (curly bits) turned out. Ornate, but not too fiddly.

...

New railings in place

...

Terracotta pots seem to suit the pool area

Most of our photos are taken from the south side of the building site, perhaps because that’s where the driveway puts you as you come up the hill. Here are a couple of shots from the north side that give a different perspective. The first one is a panorama showing the current condition of the pool area. The seating on the left is going to be great once we render the brickwork and build a pavilion roof: it’s possibly a bit too sunny at the moment.

Pano

Pool panorama

This one is taken from across the road on the opposite hill. You can see the whole project from here. From left to right: slab for our house, slab for rooms 3 and 4, the pool area (behind the poplar), timber frame under construction, and the driveway.

...

Project overview shot

And finally, I know I take too many photos of this mountain, but forgive me.  It’s hard to resist, and I don’t get out much.

...

Mount Mycale and Mount Thorax in changeable morning light

 

Deliveries

Let me warn you up front: this blog post, and probably future posts for a while, are going to be variations on the theme of “look at this thing we made!”

With that said… I am learning, too late in life, that a huge part of construction is just moving stuff around.  Here are three of our most recent deliveries, more or less neatly stacked.

Bricks

Bricks

Steel

Steel

Timber

Timber

That last one is not just a gratuitous night-time shot: the timber really did arrive late in the evening.  In fact it was delayed for a week or so longer than we were expecting.  The 10cm x 10cm pieces on the right are chemically treated to resist moisture, and those took a while to get hold of.

It wasn’t really a problem though.  We have so much to do if we’re going to hit our target of real guests by late summer, so we just worked on some landscaping instead of timber framing.  This next shot is yet another Sketchup model showing our plans for around the pool.  A steel railing to stop people falling off the terrace after one Tuborg too many, and on the other side a little pavilion surrounded by gardens and incorporating two built-in seating areas.  In summer we’ll hang some canvas or cotton at the front of the seating area to keep people in the shade during the hot afternoons.

Some of the planned landscaping around the pool.

Some of the planned landscaping around the pool.  The shadows are as they would be on the summer solstice at around 4pm.

Sharp-eyed readers will note that we haven’t really decided what’s happening at the back of the pool: probably a wooden fence with a lattice to grow climbing plants on.  It would be nice to have a rendered and limewashed brick wall but we’re thinking it’s a bit too close to the edge of the hillside for a heavy wall to be 100% safe.  Anyway, here’s the progress we’ve made in the last week on the seating area.

Poolside seating pavilion, under construction

Poolside seating pavilion, under construction

Koray, the guy you saw welding a door in the previous post, is now working with us full-time.  We really needed some more people power if we’re serious about opening the first two rooms this summer.   One of the first things he did for us was to install that door.

The door Koray was welding in the last post, now safely installed.

The machine room door, now safely installed.  (I did the twirly bits, honest.)

Koray has also done great work on building a stone retaining wall up the left side of the driveway, as well as a dozen other things.

Stone retaining wall on driveway nearly finished

Stone retaining wall on driveway nearly finished

Which reminds me, a big thank-you to my cousin Stephanie and her partner Mick.  They visited a couple of weeks back and helped carry a lot of the stones into position.  (We are officially becoming terrible hosts: “Had enough breakfast?  All done?  OK, great, now carry this 40 kilo rock.”)

At the foot of the stone wall there’s a concrete gutter.  Previously this ran into a large hole that connected to the storm-water drain.  Health and safety concerns suggest we shouldn’t leave a large hole lying around long-term, so I got to improve my bricklaying and rendering skills by building a drain cover.   We tried using powdered dyes to colour the rendering coat: two scoops of red, four scoops of yellow, and one scoop of black.  Not too bad a result if you like the Santa Fe adobe look.

Here's one I made earlier: drain cover

Here’s one I made earlier: drain cover.  Note modernist grille made by welding scrap rebar pieces together.

Here are a couple of photos of things we’re making with all those deliveries.  The bricks are for parts of the guest bathroom walls.  We’re still committed to straw bale, but we lost our nerve at the thought of the waterproofing needed to be sure that a straw bale in the wall behind a shower would never get wet.  So the external walls of the bathroom, and the wall between the two bathrooms, will be brick.  Still, they’re big 30 x 20 cm bricks with some air holes in them, there’ll be a double wall, and the 10cm gap between the inner and outer wall will be filled with polystyrene insulation.  It won’t quite be as good as straw, but should still be reasonably well insulated.

The first two guest bathrooms laid out with bricks

The first two guest bathrooms laid out with bricks.   Each bathroom is about 3 metres by 2 metres: big enough for everyone?

The steel is for pool terrace railings as shown in the Sketchup picture above.  They’re nearly done; they just need some twisty decorative bits (“ferforje” in Turkish) and a coat of black paint and they’re ready to go in.

Pool terrace railings under construction

Pool terrace railings under construction

And all this welding seems to be catching:  Sirem has now joined the party.  It looks like she’s been doing it for years, doesn’t it?

Sirem getting in on the welding action.

Sirem getting in on the welding action.  (Thanks to Stephanie for the photo.)

We’re still some distance away from the straw bale and plastering stage, but we’ve done some more testing recently to decide between clay plaster (which has the benefit of basically being free) and lime plaster, which stands up to moisture a lot better.  I think we’ve decided on the lime plaster solution, but it’s a shame to have to say no to the clay as the texture is really nice.

Plaster testing: three coats of mud plaster

Plaster testing: three coats of clay plaster on a straw bale (second coat still showing at the top there)

Plaster testing: two coats of lime plaster on a straw bale

Plaster testing: two coats of lime plaster on a straw bale

The pool has been properly filled and we are pleased to report that it didn’t fall over or spring a leak.  There was even a warm day in late February when I was stupid enough to try a first swim.  The pool was very nice but the water needs a bit more sun on it, I think.

What the pool looks like now

What the pool looks like now

And finally, a few shots of plants and animals to show that it is not quite all-construction, all-the-time.

Spring returns: almond blossoms in the neighbour's garden

Spring returns: almond blossoms in the neighbour’s garden

Zeliş relaxing

Zeliş relaxing

Zeytin is in a good mood, as usual.

Zeytin is in a good mood, as usual.

Cezmi, Sirem's sister's cat, maybe now our  cat, who believes he is the construction site manager

Cezmi, Sirem’s sister’s cat, maybe now our cat, who believes he is the construction site manager

Thanks for reading!

Planning permission is go

Big news: the council has finally granted planning permission for our revised four-hotel-rooms-plus-a-house idea.  Like every bureaucratic process it took longer than we expected or wanted, although we did get some reassuring feedback on the structural soundness of our designs.  Anyway, we’re really glad it’s all sorted, and now we can move on to getting quotes for the concrete-slab foundation work and the pool.

Now we can build all this!

Now we can build all this!

A while ago we passed our one-year anniversary of being here.  It would be great if more had happened up in the orchard by now — at the moment it’s just the fig trees, dry grass, marker pegs, and one steel telegraph pole with a light and a power connection box.  But we’re optimistic that with all of the red tape out of the way, some earth should start getting moved around very soon.

One thing that we did manage to finish before the one-year mark was the kitchen.  I know it has been drawn out over many blog posts, but it is now finally, properly finished.  Here are some shots showing the tiled worktop and the finishing touches on the woodwork.

High-angle view of the kitchen.

High-angle view of the kitchen.  Hope everyone likes the tiles.

The kitchen sink view looks out into the street at tractor-wheel height.

The kitchen sink window looks out into the street at tractor-wheel height.

Free-standing cabinet between the fridge and the door.  Plus added cat (Maya).

Free-standing cabinet between the fridge and the door. Plus added cat (Maya).

My mum and dad came to stay with us for the first half of August — we are trying to talk them into coming at a less outrageously hot time of year for their next visit.  But it was good seeing our progress through their eyes, as they were last here almost exactly a year ago.  Dad was extremely helpful in the garden, as he was the first time around.  And they talked us into taking a seaside break for a few days: the first nights we had spent away from this place since we arrived.  (A huge thank you to Sirem’s sister Çisem for holding the fort and feeding all the animals while we were away.)

We spent three nights at the Panion Park Hotel in the coastal town of Guzelçamlı, close to the entrance to the Dilek National Park.  It was a really pleasant, quiet hotel and we can recommend it.  They have a lovely pool and an equally lovely bar by the pool.  They’ve only been open for six years and we were impressed with how well their landscaped garden had come along.  Lots of ideas to file away for future reference.

The view from our room in the Panion Park Hotel.  Great garden.

The view from our room in the Panion Park Hotel. Great garden.

What else have we been up to?  A recent carpentry project was the door to the second bedroom.  The old door was a bit of a mess and we had to lock it with a very amateurish chain and padlock around the handle.  More importantly, the doorway was much lower than it needed to be, with a small window over the door for no good reason.  More than one taller visitor had smacked their head on the low lintel (sorry, Mark). So we came up with a plan for a full-height door that included a central window with shutters for extra ventilation in summer.  Sketchup again, of course.  We think it all turned out OK.

New door from the outside, shutters closed.

New door from the outside, shutters closed.

From the inside: going for a medieval look with all the black iron hardware.

From the inside: going for a medieval look with all the black iron hardware.

And with the shutters open to let in a breeze.

And with the shutters open to let in a breeze.

The weather has been really hot, of course, but never humid.  We found that the sun was tracking so far north that we weren’t getting enough shade on the sedir in the middle of the day.  So we’ve rigged up some sheets to make it feel more pleasant.

Dealing with the heat: sheets as shadecloth.

Dealing with the heat: sheets as shadecloth.

The grape vines do well in all that sun.

The grape vines do well in all that sun.

Summer also brings the insect population to life.  (Which is mostly fine, honest: even the wasps have their role in pollinating the figs.)  One day we found some ants struggling to lift something up the wall and into the garden.  Turns out they had stolen a cat biscuit, and were cooperating admirably to get it back to the nest.

The ant helpfully standing on the biscuit must be the one in charge, surely.

The ant helpfully standing on the biscuit must be the one in charge, surely?

And to conclude: some readers will be unsurprised to learn that our four kittens have not found new homes yet.  We still haven’t named them, because we are clinging to the (perhaps foolish) belief that we’re going to successfully give most of them away.  In an effort to show potential adopters how cute they are, here are some photos at 2 weeks and at 5 weeks.  Incredible how much the ears grow over that time.

The tabby one.

The tabby one.

august-7

The black one.

The black one.

august-6

The white one.

The white one.

august-5

The grey one (who Sirem refuses to give away).

The grey one (who Sirem refuses to give away).

august-8

Summer: postscript

As promised, some photos of the finished furniture that Joe helped to make.  The desk is great for days when it’s too hot to sit inside with a PC exhaust fan going, and the cupboard is built like a tank and will outlast us all.

Portable computer desk

Portable computer desk

Cupboard for the verandah

Cupboard for the verandah

So much room for shoes, pet food, vacuum cleaners, etc.

So much room for shoes, pet food, vacuum cleaners, etc.

Also, some gratuitous kitten photos.

The kittens are getting bigger...

The kittens are getting bigger…

... and cuter.

… and cuter.

Summer

In another few weeks, we will have been here for a year.  Predictably, the time has flown past, and I suppose I should be more worried that we don’t have any new buildings yet.  But I’m still happy with our progress: we’re getting there.  The bureaucratic checklist is nearly complete and we should be able to break ground on the foundations for the cafe and bungalows soon.

In the meantime, summer has definitely arrived.   Afternoon temperatures are in the mid 30s, and we can go for a couple of weeks without any rain.  The sea has warmed up and an afternoon swim at Pamucak Beach or in the Dilek National Park is always tempting.

Visitors continue to give us a good excuse to get out and discover all the fantastic places around us.  I know I keep going on about ruined Ionian cities, but there really are dozens of them around here.  Priene was one we hadn’t seen before.  It sits up on a bluff overlooking the mouth of the Meander river, and is only a few kilometres from the site of the Battle of Mycale where the Greeks destroyed a retreating Persian force in 479 BC.

The theatre at Priene.

The theatre at Priene.

Sirem among the columns.

Sirem among the columns.

Priene is big enough and famous enough to have a ticket office and a very reasonable admission charge, but like Tralleis and Magnesia, we had the place pretty much to ourselves.  It is a great spot to visit on a hot day, because the elevation means you get a breeze coming in from the sea, and the encroaching pine forest gives a lot more shade than at other more exposed sites.

View from the ruins of Priene out across the Meander Valley.

View from the ruins of Priene out across the Meander Valley.

Priene is also close to the half-abandoned, half-restored village of Eski Doğanbey, so we dropped in for another visit.  I can’t help taking photos there.

Blue shutters.

Blue shutters in Eski Doğanbey.

Renovation project, would suit first-time buyer.

Renovation project, would suit first-time buyer.

Our guest that day was Mark, an old friend of mine from Australia.  Here he is getting comfortable at Priene.  Mark was only here for a few days but I hope we helped him to unwind.

A game of thrones: Mark briefly appoints himself king of Priene.

A game of thrones: Mark briefly appoints himself king of Priene.

The day after Mark left, Joe arrived for a two-week stay.  Joe is a friend of ours from Southampton, and a former work colleague of mine.  He wanted to get some sun before an imminent move to Norway.  Anyone considering visiting us in the future should know that Joe has set the bar very high in terms of helping to build things.  He helped do the last of the cabinet doors in the kitchen, as well as a large (and very heavy!) storage cupboard for the verandah, and a computer desk on wheels that makes it much easier to watch movies at night in the courtyard.  Joe, thanks again.

Joe enjoys a mug of ayran by Lake Bafa.

Joe enjoys a mug of refreshing ayran (yoghurt, water, and salt) at a lakeside restaurant.

The storage cupboard and the computer desk deserve photos but I’m going to wait until they’re sanded and stained, etc., so Joe’s efforts get the best possible presentation.  Also, for anyone who wants to see Ephesus but only has 37 seconds to spare, I give you Joe’s GoPro video of his visit.

Most of our visitors have arrived at Izmir airport, about an hour to the north, but Joe flew into Bodrum/Milas, which is south of us and a little further away.  The drive down there is interesting, as the middle section runs along the shore of Lake Bafa, which was once part of the Aegean Sea until the Meander River silted up and blocked the connection.

Sunset over Lake Bafa.

Sunset over Lake Bafa.

Fish restaurant on the lake.

Fish restaurant on the lake.

On the way back we saw brown tourist signs for “Euromos”, a city we’d never even heard of.  Very glad we stopped though, as we got to see the sun setting behind the Temple of Zeus.

The Temple of Zeus at Euromos.

The Temple of Zeus at Euromos.

Summer has also brought a different species of visitor.  We try to be responsible pet owners and get all of our animals spayed as soon as they’re ready.  But our youngest cat, Sookie, got pregnant sooner than expected and we missed our chance.  (If your vet tells you six months, do it at five.)  So we are now the proud and slightly alarmed grandparents to four new kittens.

Kittens, less than 24 hours old.

The proud mother with her kittens, less than 24 hours old.

We are of course looking for good homes for them all.  It would be crazy to keep four more cats.  Totally crazy.  Out of the question…

Going up-river

We hit a minor milestone last Friday: we finished the tiling and painting work on the third of the farmhouse bedrooms. This will definitely help with accommodating future visitors, but it also gave us the space to unpack almost all of the remaining boxes from our move. It was good to see our books again, for example.

Our third and final farmhouse bedroom, tiled and painted.

Our third and final farmhouse bedroom, tiled and painted.

Two dogs means two dog houses.

Two dogs means two dog houses.

Zeliş needed a dog house to keep warm just as much as Zeytin did, so that was one afternoon’s construction work. Still needs to be painted though.

The kitchen is still not finished, which makes me feel guilty. But there’s progress all the time: here’s a shot of the new pantry, and you can see our rustic handmade drawers on the right.

Kitchen progress.

Kitchen progress.

We’ve reached the stage now where it’s time to lay the backsplash and countertop tiles. We already bought ornately decorated hexagonal tiles for the worktop, but we needed something complementary for the backsplash. Sirem had heard that there were great stone tiles to be had in Denizli, a city a few hours away up the Menderes Valley. It was time to take a drive up-river.

The Menderes valley looking from west to east.

The Menderes valley looking from west to east.

A brief geography reminder: we live on the north side of the valley of the Menderes river, which for the Ancient Greeks was the Meander or Maiandros. Nowadays the valley is known as a great place to grow figs, but in the ancient world it was the start of the main route from Europe into Asia. Most of Turkey is one big mountainous plateau, and the valley of the Meander gave an easy approach into the Anatolian interior, avoiding the steep mountains of the south coast. It’s weird to think that Xerxes, Xenophon, and Alexander the Great all travelled up or down the valley and probably within a few kilometres of our house. (For more historical background, if anyone is curious, we recommend Jeremy Seal’s excellent book Meander: East to West along a Turkish River, which two different sets of friends gave us as a very appropriate gift.)

On the map above, Denizli is right up at the top of the valley, near Pamukkale, which is a big tourist attraction because of its unique limestone terraces. We visited Pamukkale on  a holiday years ago, and we must have driven west down the main valley road as there’s no other way to get to Ephesus, our next stop. But we don’t have a clear memory of that drive, and this time around we have never gone further inland than Aydin. So the day felt like an expedition into new territory.

View across the Menderes valley near Pamukkale.

View across the Menderes valley near Pamukkale.

The mountains either side of the upper valley reach 2000 metres and more, so there was still plenty of snow on the peaks. We stopped at Pamukkale but it didn’t photograph well on an overcast day, so I have shamelessly stolen a picture from Wikimedia Commons. As you can see, it’s worth a visit in summer.

The terraces at Pamukkale. Not my photo: credit goes Antoine Taveneaux and Wikimedia Commons.

The terraces at Pamukkale. Not my photo: credit goes to Antoine Taveneaux and Wikimedia Commons.

After some searching we found the tile place we were looking for. I think the guy who helped us was maybe used to larger pallet-sized orders, but he graciously did not complain about helping us to count out several hundred individual tiles and load them into the back of the truck. In the rain. We’re very happy with them: the lighter marble squares are for the kitchen backsplash, and the chunky stone tiles are to make a kind of skirting-board in the oldest bedroom that should protect the base of the mud-brick walls.

Stone tiles from Denizli.

Stone tiles from Denizli.

And now I should go and feed some hungry dogs. Until next time!